Story queue 2026-08-12
MUST-COVER OVERFLOW
- missing_material_delta ercot-prs-2026-08-12-meeting — Sig 8, PRS Combined Ballot (vote outcomes on pending NPRRs) — a real decision record. But prior_coverage=true and no material_delta is stated anywhere in the payload (member-level material_delta is null, and the matching watch thread's last_material_delta is also null). The re-selection rule requires a stated why-today/what's-new for any thread with prior coverage; none is available here, so the pick is invalid as given rather than silently dropped.
- missing_material_delta isone-large-loads-integration-aug2026 — Sig 7, ISO-NE informational report to FERC on large-load resource adequacy. prior_coverage=true and the matching watch thread's flag is already 'satisfied', but no material_delta is stated for what's new since prior coverage — cannot justify why-today under the re-selection rule.
SELECTED QUEUE — thin day: Only two candidate episodes were supplied for this cohort day, and both carry prior_coverage=true with no material_delta stated anywhere in the payload. Per the re-selection rule, no delta stated means the pick is invalid, so neither qualifies for the queue. The queue is empty by construction, not by budget shortfall — both high-significance items are routed to must_cover_overflow for operator read rather than dropped.
WATCH RAIL — outside the story budget
open amazon-cincinnati-datacenter-campus pjm PJM interconnection filing or Duke Energy Ohio/AEP Ohio large-load service agreement for the campus
open aps-chip-manufacturing-load-growth west Arizona Corporation Commission rate filing or APS large-load tariff/interconnection filing for the added load
open aws-pa-gas-plant-datacenter pjm PJM interconnection filing or generation development agreement for the AWS gas-plant data center site
open az-2035-grid-snapshot west Primary 2035 resource-adequacy/reliability Snapshot planning report or its filing source — Trade press signals the primary 2035 Snapshot report is out; primary text not yet in our archive.
open bhe-montana-edam west Primary CAISO/EDAM filing or BHE Montana announcement confirming the 2028 participation commitment
open doe-genesis-mission-grid-resilience federal DOE award/cooperative-agreement announcement or Federal Register notice for the Genesis Mission initiative
open doe-nietc federal Primary DOE notice or Federal Register text confirming NIETC corridor cancellations — DOE reported cancelling proposed NIETC transmission corridor designations.
open doe-planning-software-efficiency federal Primary Federal Register notice text and DOE conference comment docket
open dominion-north-anna-esp-renewal federal Federal Register notice text / NRC docket for the North Anna early site permit renewal application — Notice recurs in feed; primary text still unstaged.
open edgecore-louisa-county-va-phase2 pjm Dominion Energy Virginia interconnection filing or county land-use/permit approval for Louisa County campus phase 2
open energy-vault-texas-datacenter-ppa ercot ERCOT interconnection filing or PPA/agreement underlying the 1.25GW supply deal
open entergy-holtec-hdec-gulf-coast-smr southeast NRC early site permit application or joint-development-agreement filing for Gulf Coast SMR siting
open ercot-ctp-batch1-tac-update ercot ERCOT CTP Batch 1 competitive transmission project selection results or further status update
open ercot-imm-state-of-market-tac ercot IMM State of the Market presentation/report delivered at the TAC workshop by 2026-08-13
open ercot-prs-2026-08-12-meeting ercot Aging Revision Request Projects review at the PRS meeting by 2026-08-12
open ercot-prs-2026-09-16-meeting ercot PRS meeting agenda/materials or results by 2026-09-19
open ercot-prs-report-tac ercot Next PRS status report to TAC
open ercot-tac-2026-08-26-meeting ercot TAC meeting agenda/materials or results by 2026-08-29
open ercot-tac-cfsg-0722 ercot Next CFSG report to TAC
open ercot-tac-cfsg-report ercot Next CFSG report to TAC
open ercot-tac-llwg-report ercot Next LLWG report to TAC
open ercot-tac-prs-0722 ercot Next PRS status report to TAC
open ercot-tac-prs-report-0826 ercot Next PRS status report to TAC — Fulfills the open watch thread's expected PRS status report to TAC.
open ercot-tac-revision-request-summary ercot Next Revision Request Summary status update to TAC
open ercot-tac-revision-request-summary-0722 ercot Next Revision Request Summary status update to TAC
open ercot-tac-rms-0722 ercot Next RMS status report to TAC
open ercot-tac-rms-report-0826 ercot Next RMS status report to TAC — Same-titled RMS report re-staged two days after the 08-19 posting; content difference unconfirmed from metadata.
open ercot-tac-ros-0722 ercot Next ROS status report to TAC
open ercot-tac-ros-report ercot Next ROS status report to TAC
open ercot-tac-ros-report-0826 ercot Next ROS status report to TAC — Fulfills the open watch thread's expected ROS status report to TAC.
open ercot-tac-staff-reports ercot Next ERCOT staff report to TAC — Fulfills the open watch thread's expected ERCOT staff report to TAC.
open ercot-tac-stakeholder-engagement-update ercot September ERCOT Board discussion/decision on stakeholder engagement
open ercot-tac-wms-0722 ercot Next WMS status report to TAC
open ercot-tac-wms-report ercot Next WMS status report to TAC
open ercot-tac-wms-report-0826 ercot Next WMS status report to TAC — Fulfills the open watch thread's expected WMS status report to TAC.
open ercot-texas-data-center-pause ercot ERCOT/PUCT filing or order on large-load/data-center interconnection pause
open eversource-isone-transmission-roe isone FERC order or settlement filing underlying the disclosed transmission-ROE charge
open ferc-large-load-senate-hearing federal Hearing transcript/testimony record from Senate ENR Committee (GET-incentives remarks) — New facet (GET incentives) surfaced from the already-watched Senate ENR hearing.
open ferc-large-load-standards ferc FERC ruling or the ISOs'/RTOs' joint extension-of-time request on large-load interconnection standards — ISOs/RTOs jointly seek 3-month extension from FERC on large-load interconnection standards deadline.
satisfied ferc-rm21-17 ferc the status-report document once staged, or FERC's resulting order on the extension request
open ferc-rm22-14 ferc FERC NOPR resolution or final order in RM22-14
open flteco-tysp southeast Tampa Electric Company's 2025 Ten-Year Site Plan PDF once staged
open google-midamerican-salix-county-iowa miso MidAmerican Energy/MISO interconnection filing or Iowa Utilities Board large-load tariff filing
open heinrich-texas-permitting federal Bill text or official legislative proposal on the permitting bottleneck
open isone-capacity-auction-reforms-keyproject isone ISO-NE status update or filing on capacity auction market redesign
open isone-extreme-weather-keyproject isone ISO-NE extreme-weather operations status update or report
satisfied isone-large-loads-integration-aug2026 isone FERC ruling on the abeyance request or resumption of the ISO-NE/PTO proceeding
open isone-necec-contested-effects isone Primary source documenting NECEC's disputed market/curtailment effects (ISO-NE report or docket filing)
open isone-order1920-keyproject isone ISO-NE Order 1920 long-term transmission planning compliance filing or update
open isone-order2023-keyproject isone ISO-NE Order 2023 interconnection reform compliance status update
open isone-order2222-keyproject isone ISO-NE Order 2222 compliance status update or filing
open miso-rasc-ferc-status miso Next RASC FERC docket status update
open miso-rasc-lba-transmission-loss miso RASC subcommittee discussion or proposed methodology revision resolving the new issue
open miso-rasc-outage-policy-evaluation miso RASC subcommittee discussion or proposed outage-policy methodology revision
open miso-rasc-sc-status miso Next RASC Steering Committee status update
open nepool-asset-condition-reviewer isone NEPOOL committee vote record or filing establishing the Asset Condition Reviewer
open nepool-pc-committee-summaries isone Next NPC Committee Summaries compilation
open nepool-pc-composite isone Next NPC meeting composite packet (following month's Participants Committee session).
open nepool-pc-coo-report isone Next month's COO status report to the NPC Participants Committee.
open nepool-pc-csc-imports-exports isone Next CSC imports/exports informational update, if the item recurs.
open nepool-pc-lit-report isone Next NEPOOL PC litigation status report
open nepool-pc-minutes isone Minutes of the next NPC Participants Committee meeting, once approved/posted.
open nepool-pc-supplemental isone Next NPC meeting composite/supplemental packet.
open nepool-pc-system-market-ops isone Next NPC System and Market Ops Report to NEPOOL PC
open nepool-pc-system-market-ops-report isone Next NPC System and Market Ops Report
open nerc-nist-mapping-rsdp-comments federal NERC notice/comment docket text for the NIST mapping RSDP proceeding
open nextera-dominion-merger federal State PUC and FERC (FPA §203) merger-approval filings/orders for the NextEra-Dominion transaction
open nj-battery-vpp-program pjm NJ BPU order or filing establishing VPP program eligibility rules
open nrc-duane-arnold-restart-eafonsi federal NRC draft EA/FONSI document or subsequent final EA/FONSI or license decision for Duane Arnold restart
open nrc-reactor-licensing-modernization federal Primary Federal Register rule text confirming scope (proposed/final rule) — Notice recurs in feed; primary text still unstaged.
open nyiso-icapwg nyiso ICAPWG meeting materials/presentation deck for the 2026-09-22 session by 2026-09-22
OVERDUE nyiso-icapwg-aggregation-manual-jul2026 nyiso ICAPWG/MIWG/PRLWG/LFTF discussion or endorsement of the M-38 Aggregation manual revisions by 2026-07-22
open nyiso-icapwg-der-small-utility nyiso MIWG/PRLWG discussion of DER treatment for small utilities in ICAP by 2026-08-19 — Final version of the DER small-utility ICAP technical bulletin, same 8/19 meeting thread
open nyiso-icapwg-manual-revisions nyiso MIWG/PRLWG discussion or endorsement of Manual 4 ICAP WRCE revisions by 2026-08-19 — ICAP Manual Revisions announcement doc posted ahead of the 8/19 ICAPWG meeting
open nyiso-icapwg-ucap-calculations-draft nyiso ICAPWG endorsement or vote on the UCAP Calculations methodology draft
open pjm-capacity-resource-mix pjm Primary PJM capacity market data or filing underlying the resource-mix competition described
open pjm-capacity-testing-requirements pjm Presentation or proposal on capacity testing requirements
open pjm-computational-load-oc-2026-07 pjm Problem statement or manual revision proposal for computational/data-center load (Project 2026-02) — PJM stakeholder outreach on Project 2026-02 computational/data-center load surfaces at OC, ahead of the anticipated problem statement.
open pjm-computational-load-pc-2026-07 pjm Problem statement or manual revision proposal for computational/data-center load (Project 2026-02) — Status presentation on Project 2026-02 computational/data-center load, delivered to PC
open pjm-computational-load-project pjm Problem statement or manual revision proposal for computational load
open pjm-data-center-plan-states-cost pjm PJM's filing or stakeholder proposal detailing the data-center/large-load cost framework
open pjm-deactivation-study-process-reform pjm PJM committee vote record or manual revision filing for the deactivation study process change
open pjm-deliverability-study-enhancements pjm Proposal/redline for the cluster-based interim deliverability study methodology enhancements
open pjm-gdecs-deactivation-chart-aug26 pjm Next generation deactivation notification status update
open pjm-gdecs-governing-document-revisions pjm MC/MRC vote adopting GDECS governing document revisions
open pjm-gen-deactivation-update pjm Next generation deactivation notification status update / newly noticed retirement filings
open pjm-governance-stakeholder-reforms-notice pjm Federal Register notice text / comment docket for PJM governance and stakeholder reforms
open pjm-interconnection-cycle1-review pjm PJM interconnection queue status report or cluster study results for Cycle 1
open pjm-interregional-planning-update pjm Next interregional planning coordination update / joint study results
OVERDUE pjm-manual-14d-revision-71 pjm MRC en-bloc vote adopting Manual 14D Revision 71 (Consent Agenda C) by 2026-07-28 — Presentation deck for tracked Manual 14D Revision 71 staged (Consent Agenda C).
open pjm-manual-14h-eit-revision pjm PC endorsement/vote on Manual 14H EIT revision — Presentation for tracked Manual 14H EIT revision arrives, consent agenda
open pjm-manual-14h-ids-revision pjm PC endorsement/vote on Manual 14H IDS revision — Redline text of proposed Manual 14H IDS revisions
open pjm-manual-14h-ieee2800-revisions pjm MRC/PC endorsement or vote on Manual 14H IEEE 2800 revisions — Executive summary for IEEE 2800 revisions now on MRC agenda for endorsement.
open pjm-manual-21b-periodic-review pjm PC/MRC vote on Manual 21B periodic review revisions — Executive summary for Manual 21B periodic review arrives at MRC
open pjm-mc-board-election-fall2026 pjm Board election results / member vote outcome
open pjm-mc-consent-c-flexible-resource-loc pjm MC consent-agenda vote adopting the flexible-resource LOC eligibility tariff change by 2026-08-19
open pjm-mc-destf-report pjm Next DESTF report to MC by 2026-08-24
open pjm-mc-dr-performance-review pjm DR performance review findings or proposed rule changes to MC
open pjm-mc-governance-stakeholder-poll pjm MC discussion/decision on stakeholder-process governance changes informed by the poll
open pjm-mc-ips-report-aug26 pjm IPS report document by 2026-08-24
open pjm-mc-market-monitoring-report pjm Next Market Monitoring Report to MC — Market Monitoring Report presentation staged for the 8/24 PJM MC meeting
open pjm-mc-market-ops-report pjm Next PJM Market Operations Report to MC
open pjm-mc-mic-report-aug26 pjm Next MIC report to MC by 2026-08-24
open pjm-mc-mrc-report-aug26 pjm Next MRC report to MC by 2026-08-24
open pjm-mc-oc-report-aug26 pjm Next OC report to MC by 2026-08-24
open pjm-mc-pc-report pjm Next PC report to MC
open pjm-mc-planning-parameter-deadlines pjm MRC/OC/PC vote or endorsement on the planning parameter deadlines problem statement — Problem statement now presented directly to MRC (previously MC issue-charge stage).
open pjm-mc-rcstf-report-aug26 pjm Next RCSTF report to MC by 2026-08-24
open pjm-mc-regulatory-report-aug26 pjm Next PJM regulatory report to MC by 2026-08-24
open pjm-mc-stakeholder-process-forum-aug26 pjm Forum recommendations / MC governance-reform discussion outcome by 2026-08-24
open pjm-mc-system-ops-report pjm Next system operations report to MC
open pjm-mc-system-ops-report-aug26 pjm Next system operations report to MC by 2026-08-24
open pjm-mc-tech-change-forum-report-aug26 pjm Tech Change Forum report document by 2026-08-24
open pjm-mc-voting-app-enhancements pjm MC discussion/decision on voting application enhancements by 2026-08-24
open pjm-mic-dual-fuel-schedule-requirements pjm MIC vote/decision on dual-fuel schedule requirements options
open pjm-mic-hybrid-resources-market-model pjm Proposal/redline for hybrid-resources market-model selection
open pjm-mic-interregional-coordination-aug26 pjm Next interregional planning coordination update / joint study results
open pjm-mic-manual-6-periodic-review pjm MIC/MRC endorsement or vote on Manual 6 periodic review revisions
open pjm-mic-net-energy-injections-q-review-aug26 pjm Next quarterly net energy injections review
open pjm-mic-stability-limit-report-jul26 pjm Next stability limit report
open pjm-mrc-bra-irm-results pjm Base Residual Auction filing/results using these reliability parameters
open pjm-mrc-capacity-parameters-periodic-review pjm MRC vote/endorsement on CONE and ACR value updates
open pjm-mrc-ceg-rmr-destf pjm MRC vote or endorsement on the CEG RMR / DESTF deactivation matters — DESTF presentation on related IL CUB deactivation matter added to MRC agenda.
OVERDUE pjm-mrc-manual-11-econregonlynem-consent pjm MRC en-bloc vote adopting Manual 11 econ/reg-only/NEM revisions (Consent Agenda B) by 2026-07-28
open pjm-mrc-manual-18-periodic-review pjm PC/MRC vote or endorsement on Manual 18 periodic review revisions
open pjm-mrc-manual-revisions-item01 pjm MRC vote or endorsement on item 01 manual revisions (Manual 11, Manual 28)
open pjm-mrc-storage-as-transmission-asset pjm Follow-up proposal or stakeholder vote on storage-as-transmission classification
open pjm-oc-day-ahead-survey pjm Next PJM day-ahead survey results
open pjm-oc-dlr-updates pjm Next DLR status update / deployment findings
open pjm-oc-dlr-updates-aug6 pjm Next DLR status update / deployment findings
open pjm-oc-fuel-inventory-survey pjm Next fuel inventory data request survey results
open pjm-oc-fuel-inventory-survey-summer2026 pjm Next fuel inventory data request survey results
open pjm-oc-hot-weather-update pjm Next hot weather operational status update
open pjm-oc-hot-weather-update-aug6 pjm Next hot weather operational status update
open pjm-oc-operating-metrics pjm Next OC operating metrics presentation
open pjm-oc-operating-metrics-aug6 pjm Next OC operating metrics presentation — Original version of the item 02 operating metrics deck, superseded by the 'updated presentation' also in this batch.
open pjm-oc-reliability-compliance-update pjm Next OC reliability compliance status update
open pjm-oc-reliability-compliance-update-aug6 pjm Next OC reliability compliance status update
open pjm-oc-security-update pjm Next OC security status update
open pjm-oc-security-update-aug6 pjm Next OC security status update
open pjm-oc-winter-prep-visit-update pjm Next winter generator site preparedness visit update
open pjm-pc-fuel-switching-issue pjm Proposal or solution package addressing the fuel-switching issue
open pjm-pc-ltplanning-nopr-feedback pjm PJM's compiled stakeholder feedback or comment filing on the long-term transmission planning NOPR
open pjm-pc-manual-21b-periodic-review pjm PC/MRC vote on Manual 21B periodic review revisions — Presentation now posted for Manual 21B periodic review.
open pjm-pc-reliability-compliance pjm Next reliability compliance status update/report to PC — Next recurring reliability compliance status report to PC.
open pjm-pc-reliability-compliance-aug4 pjm Next reliability compliance status update/report to PC
open pjm-regulation-redesign-phase2 pjm NPRR or market-rule filing/vote on Regulation Market Redesign Phase 2 — Status update on Regulation Market Redesign Phase 2 at OC, precursor to the anticipated NPRR/vote.
open pjm-teac-5034-immediate-need pjm TEAC solution selection/vote for Immediate Need Project 5034
open pjm-teac-gen-deactivation-aug4 pjm Next generation deactivation notification status update / newly noticed retirement filings by 2026-09-08
open pjm-teac-gen-deactivation-sep8 pjm Next generation deactivation notification status update / newly noticed retirement filings
open pjm-teac-interregional-planning-aug4 pjm Next interregional planning coordination update / joint study results by 2026-09-08
open pjm-teac-interregional-planning-sep8 pjm Next interregional planning coordination update / joint study results
open pjm-teac-m3-process-needs-aug4 pjm Next M-3 process needs status update by 2026-09-08
open pjm-teac-market-efficiency-aug4 pjm Next market efficiency project analysis update by 2026-09-08
open pjm-teac-market-efficiency-sep8 pjm Next market efficiency project analysis update
open pjm-teac-occ-comments-sep8 pjm TEAC discussion/resolution of outstanding OCC comments
open pjm-teac-planning-process-special-0716 pjm Any future Manual 3 revision or PC/MRC vote changing the transmission planning-process manual
open pjm-teac-reliability-analysis-aug4 pjm Next TEAC reliability analysis update / substantive findings report by 2026-09-08
open pjm-teac-reliability-analysis-update pjm Next TEAC reliability analysis update / substantive findings report
open pjm-teac-supplemental-projects-aug4 pjm Next TEAC supplemental project review update by 2026-09-08
open pjm-teac-supplemental-projects-sep8 pjm Next TEAC supplemental project review update
open pjm-vpp-federal-ruling pjm Primary order/ruling text on virtual power plant participation in PJM markets — Federal ruling reported on virtual power plant participation in PJM markets.
open ppl-blackstone-gas-turbines-pa pjm PJM interconnection filing, generation development agreement, or PPL/Blackstone JV announcement documenting the turbine order
open scpsc-docket-2026-186-eg southeast Hearing testimony record or PSC order in Docket 2026-186-EG
open southern-co-large-load-growth southeast Georgia PSC filing or Southern Co. IRP/tariff update detailing large-load service and cost terms — Q2 earnings call attributes growth to data centers; no Georgia PSC filing staged yet.
open spp-bod-addmat spp Minutes of the BOD meeting for 2008-07-29
open spp-bod-agenda spp Minutes of the BOD meeting for 2009-04-28 — Revised background materials supersede the initial packet for the same April 20, 2009 BOD meeting.
open spp-bod-annual-meeting spp Next Annual Meeting of Members materials/minutes
open spp-bod-bid-deposit-proposal spp BOD vote or decision on the SPC's Bid Deposit Proposal recommendation
open spp-bod-biweekly-status spp Next SPP BOD biweekly status report
open spp-bod-exec-session spp Next SPP BOD executive session record or resulting public action
open spp-bod-integrated-marketplace spp BOD discussion/decision or follow-up filing on the commitments mechanism
open spp-bod-market-status spp Next SPP Board market status report
OVERDUE spp-bod-mc-special-mtg spp Minutes/results of the special Board Meeting for 2024-06-12 by 2024-06-19
open spp-bod-mc-special-mtg-0903 spp Board/Members Committee resolution or vote result from the special session by 2026-09-03 — Called as a special joint Board/Members Committee session, unlike routine monthly meetings.
open spp-bod-mc-special-mtg-minutes spp Any resulting SPP filing or Board resolution from the 2024-05-07 special session — Minutes for the 2023-08-15 special meeting whose materials were also logged this batch.
open spp-bod-minutes spp Next SPP BOD meeting materials packet in this series — Minutes for the 2023-07-25 BOD/MC meeting whose materials packet was also logged this batch.
open spp-bod-minutes-19971112 spp Next SPP BOD meeting minutes/materials in this series
open spp-bod-minutes-19990928 spp Next SPP BOD meeting minutes/materials in this series
OVERDUE spp-bod-mopc-agenda spp BOD/MOPC meeting minutes/results for the 2013-07-01 session by 2013-07-01
open spp-bod-project-tracking-rpt-2008q4 spp Next quarterly SPP project tracking report
open spp-bod-rate-impacts-memo spp BOD discussion or decision referencing this rate-impacts analysis
open spp-bod-smom spp Any resulting SPP filing or Board resolution from the special members meeting
open spp-bod-stakeholder-survey spp Next stakeholder satisfaction survey results, if conducted again
OVERDUE spp-bod-suppmat spp BOD meeting minutes/results for the 2013-07-30 session by 2013-07-30
OVERDUE spp-bod-workshop spp BOD discussion or outcomes following the 2014-06-09/10 workshop by 2014-06-10
open spp-eis-market-completion-timeline spp Status update or completion filing for the EIS Market
open spp-eis-readiness-response spp Further EIS market readiness status update or completion filing
OVERDUE spp-mopc-agenda spp MOPC meeting minutes or resulting recommendation for 2020-10-13 by 2020-10-20
open spp-mopc-minutes spp Next SPP MOPC meeting materials packet in this series
open spp-mopc-nedtf-briefing spp Next MOPC follow-up update referencing this task force briefing
open spp-mopc-report-bod spp Next MOPC report to the SPP Board of Directors
open spp-mopc-rtwg-trr123 spp MOPC/RTWG vote or further status on TRR 123
open spp-oge-sponsored-upgrade spp SPP Board or stakeholder decision on the OGE-sponsored upgrade — New Q&A round on OGE's sponsored-upgrade request
open spp-order1920-engagement spp SPP's Order 1920 compliance filing or stakeholder engagement session results
open spp-rsc-action-items-status spp Next RSC Action Items Status Report
open spp-rsc-addmat spp Minutes of the RSC meeting for 2009-01-26
open spp-rsc-agenda spp Minutes of the RSC meeting for 2009-04-27 — Adds RR549 Winter Season RAR additional materials to the 2023-07-24 RSC packet.
open spp-rsc-bylaws-agenda spp RSC Bylaws Committee minutes or resulting bylaws amendment
open spp-rsc-cawg-summary spp RSC discussion/action stemming from the CAWG summary
open spp-rsc-long-term-planning-presentation spp RSC discussion or recommendation following the long-term planning presentation
open spp-rsc-ltcrtf-status spp Next LTCRTF status update to RSC
open spp-rsc-minutes spp Next SPP RSC meeting materials packet in this series — Minutes for the 2023-07-24 RSC meeting whose materials packet was also logged this batch.
OVERDUE spp-rsc-net-conference spp Minutes of the RSC net conference for 2019-08-05 by 2019-08-12
open spp-rsc-oms-seam-liaison-next-steps spp RSC vote/decision adopting the Seam Liaison Committee's next steps
open spp-rsc-operational-objectives spp Next RSC Operational Objectives report, if issued as a recurring series
open spp-rsc-retreat spp RSC retreat outcomes or follow-up materials
open spp-rsc-rr515-waiver spp RSC vote or resolution on the RR515 waiver process
open spp-rsc-seams-update spp RSC discussion or recommendation following the July 2017 Seams Update — Revised RSC seams update presented at the 2017-07-24 meeting, under the ongoing seams cost-allocation thread.
OVERDUE spp-rsc-special-mtg spp Minutes of the RSC special meeting for 2021-06-14 by 2021-06-21
open spp-rsc-special-mtg-minutes spp Any resulting SPP filing or Board resolution from the special session
OVERDUE spp-seams-brattle-presentation spp RSC discussion or recommendation on Brattle's seams cost allocation analysis by 2012-04-23
open spp-seams-report spp RSC discussion or recommendation following up on the Seams Report findings
OVERDUE spp-technical-conference spp Technical conference materials or outcome summary by 2007-01-28
open spp-west-baa-tariff-urgent-status spp SPP Board vote record or resulting West BAA tariff filing at FERC
open trump-v-slaughter-ferc ferc SCOTUS opinion/case record in Trump v. Slaughter plus any FERC statement on removal-power implications
open trump-wind-pause-court-ruling federal Court opinion/order text or DOD notice confirming the wind-review freeze is lifted — Trade press reports the DOD onshore-wind review freeze has lifted, corroborating the tracked thread
open tva-clinch-river-hearing federal NRC hearing outcome / construction-permit licensing decision — NRC has noticed a hearing for the Clinch River Unit 1 construction-permit review
open tva-clinch-river-unit1-licensing southeast NRC hearing outcome / construction-permit licensing decision for Clinch River Unit 1
open tva-nuclear-priority-interim-ceo southeast TVA investor materials, 10-Q, or IRP filing detailing nuclear investment priorities
open verrus-salem-oregon-datacenter west Oregon land-use/permit decision or utility interconnection filing for the Salem data center campus
open virginia-scc-datacenter-tx-cost-allocation pjm Virginia SCC order text / docket filing on transmission cost allocation for data centers
open wisconsin-atc-stargate-tx-line miso Wisconsin PSC order or ATC's refiled transmission-line application
CANDIDATES — KEPT & JUDGEABLE (30)
Dates on non-tip candidates are derived from URL paths (tips carry real published dates).
cover_now 8 ercot PRS Combined Ballot ercot-prs · url-date 2026-08-12
PRS Combined Ballot for the Aug 12 meeting — vote outcomes on pending NPRRs, a market-design decision record. · ercot-prs-2026-08-12-meeting · immediate · medium
cover_now 7 isone ferc informational rpt resource adequacy large loads isone-key-projects · url-date 2026-08-12
ISO-NE informational report to FERC on resource adequacy from large-load growth; ties to large-load watch. · isone-large-loads-integration-aug2026 · this_week · medium
watch 6 federal Virginia Electric and Power Company, (Doing Business as Dominion Energy Virginia); North Anna Site; Early Site Permit Renewal Application tip-federal-register-nrc 2026-08-12
NRC Federal Register notice on North Anna ESP renewal; matches tracked thread, text not yet staged. · dominion-north-anna-esp-renewal · monitor · high
watch 5 isone joint motion for abeyance iso ne and pto ac isone-key-projects · url-date 2026-08-12
Joint motion to pause ISO-NE/PTO proceeding, likely tied to pending FERC large-load action. · isone-large-loads-integration-aug2026 · this_week · low
discard 3 Michigan Voters Just Sent a Resounding Message About Data Centers tip-inside-climate-news 2026-08-12
Electoral commentary on data-center siting sentiment, not a governance document. · single:3f199548-fc8c-5320-aad5-935b9534c2e5 · monitor · medium
discard 2 United States on Track for Record Natural Gas Production in 2026 tip-cleantechnica 2026-08-12
Macro production trend, no market-design or governance hook. · single:27b0882f-aac5-593f-8091-cbc082c3379c · monitor · high
discard 2 isone large loads integration key project isone-key-projects · url-date 2026-08-12
ISO-NE key-project index/landing page, no document; substance covered by items filed beneath it. · single:2e6a7aab-b56f-5f61-965e-e427d83713e0 · monitor · high
discard 2 Sosteneo to buy 350MW German wind repowering portfolio tip-power-technology 2026-08-12
German wind portfolio acquisition, international corporate deal. · single:6de77e81-1fd0-53c1-bb2f-4d3def6c1eec · monitor · high
discard 2 Proposed Farm Bill Changes Don't Solve Issues With RFS tip-realclear-energy 2026-08-12
RFS/farm-bill op-ed, biofuels policy not electricity market governance. · single:92921ae9-3de8-58a4-80b1-9dab2ae9e480 · monitor · high
discard 2 Triton Power Company; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments tip-federal-register-doe 2026-08-12
Routine FERC hydropower relicensing procedural notice for a single project; not market-design governance. · single:9fcbf043-e76b-50e6-8a2e-fdc66090cff1 · monitor · high
discard 2 federal Pacific Gas and Electric Company; Notice of Availability of Environmental Assessment tip-federal-register-doe 2026-08-12
Routine NEPA environmental-assessment availability notice; no governance/market-design angle stated. · single:aacec07b-d988-57f5-9b7a-6b81a1d4b874 · monitor · medium
discard 2 federal How to sell small clean energy tax credits tip-latitude-media 2026-08-12
General tax-credit-transfer explainer; not tied to a specific proceeding or filing. · single:b1ac71e2-d7ed-5f2e-8276-7652b4cbff80 · monitor · high
discard 2 Sierra Club Welcomes MassPRIM Climate-Risk Review, Urges Accountability in Manager Selection tip-cleantechnica 2026-08-12
Pension-fund manager-selection climate story; not electricity market governance. · single:d3537995-f247-500a-ace2-a73c4c0428d0 · monitor · high
discard 2 Digital Core REIT to sell stakes in three US data centers back to Digital Realty, buys stake in two facilities in Asia tip-datacenterdynamics 2026-08-12
US data-center stake swap between REITs; a real-estate deal, not a governance filing. · single:e19cc19e-108d-5c93-b97b-b3d3535ff3a1 · monitor · high
discard 1 Arcfox Goes Battery Swapping with the Help of CATL tip-cleantechnica 2026-08-12
Chinese EV battery-swap corporate news, unrelated to power markets. · single:396afece-616b-5694-b5b9-816e15e8c9f5 · monitor · high
discard 1 Ipeks Geothermal to drill 13 wells for geothermal greenhouse in Afyonkarahisar, Türkiye tip-thinkgeoenergy 2026-08-12
Turkish geothermal drilling project; out of beat (non-U.S., project-level). · single:4cd7fef1-6dfc-5ef8-a393-f71d7ba5177f · monitor · high
discard 1 Trump-Connected Greenland Energy Company Falls On Its Face tip-cleantechnica 2026-08-12
Foreign corporate/political story, out-of-beat. · single:53fc094e-98c4-5775-8f17-a97959af0f69 · monitor · high
discard 1 We’ve Got Sexy Heat Pumps. Now It’s Time for Sexy Water Heaters. tip-heatmap-news 2026-08-12
Consumer water-heater product feature; no governance angle, out of beat. · single:7a9c8642-392f-5670-bd83-1e2dcf7482ae · monitor · high
discard 1 Rapid7-Omdia Research Reveals AI Governance Gap as Executive Security Leaders Show 1.6x Greater Concern Than Practitioners tip-globenewswire-energy 2026-08-12
Cybersecurity market-research PR; unrelated to power markets. · single:821fcef7-5178-5dad-8468-d78cf11498f7 · monitor · high
discard 1 Port of Antwerp-Bruges Welcomes AEM Electrolyzer to Drive Green Hydrogen Production tip-hydrogen-fuel-news 2026-08-12
Belgian electrolyzer installation; out of beat (non-U.S. hydrogen project). · single:88451973-76a9-5bf8-8d2e-2cc1ad1cc0e6 · monitor · high
discard 1 Technology: Finding Lost Cities, Hidden Minerals tip-realclear-energy 2026-08-12
RealClear tech/archaeology piece; op-ed aggregator noise, unrelated · single:919d0be7-3d92-546b-bab7-c4a0f668cccb · monitor · high
discard 1 Oracle partners with Quantinuum to deploy Helios quantum computer on OCI tip-datacenterdynamics 2026-08-12
Quantum-computing cloud partnership; not power-market governance. · single:a5c3dac8-a516-503c-aba2-e08452c3330a · monitor · high
discard 1 Hanford Site grouting developments could accelerate cleanup tip-ans-newswire 2026-08-12
Hanford nuclear cleanup site update; DOE but out-of-beat (site remediation, not market governance). · single:a80ce207-8a4c-5aca-82fb-77af6662b0c8 · monitor · high
discard 1 Why Are Oil Prices Rising tip-realclear-energy 2026-08-12
Oil commodity price commentary; not electricity market governance. · single:b049e0fd-08f5-5075-af99-94129a6bfa14 · monitor · high
discard 1 Acciona Energía to add 33MW/66MWh BESS in Spain tip-energy-storage-news 2026-08-12
Spanish battery storage project; non-US, out of beat. · single:b15cc5be-141e-50ba-983f-5b81aa52299b · monitor · high
discard 1 Europe’s largest battery comes online in Scotland tip-pv-magazine 2026-08-12
UK battery-storage project; outside US governance scope. · single:c57ed0f7-d1f5-5cc2-8400-33a31672e6a6 · monitor · high
discard 1 This El Niño Is a Warning tip-heatmap-news 2026-08-12
Climate opinion/commentary piece; not governance news · single:cd9e2819-0ee7-566b-b3d7-46ec83411f6f · monitor · high
discard 1 Colombia: Earthquake affects power grid, but no damage reported at solar plants tip-pv-magazine 2026-08-12
Colombia earthquake, no reported grid damage; international non-event · single:e66e2e71-6eaa-5d08-ae90-253f0de6aa26 · monitor · high
discard 1 AI That Can Take Down Governments Months Away tip-realclear-energy 2026-08-12
Off-topic AI-safety commentary; unrelated to electricity governance. · single:f4d7b2f4-3805-52d9-86d1-2b82d4d6038d · monitor · high
discard 1 New online map shows Germany’s renewable energy feed-in capacity across distribution grids tip-pv-magazine 2026-08-12
German grid-capacity map tool, international, out of beat. · single:fff0f026-d1fc-5d73-b702-6ebb6f457906 · monitor · high
PRE-FILTERED (40) — probe_artifact=2, tip_junk_pattern=38
tip_junk_pattern tip-electrek gas-prices-are-about-to-go-even-higher-heres-how-to-use-an-e-bike-to-save-money/
probe_artifact ercot-prs https://www.ercot.com/robots.txt
tip_junk_pattern tip-pr-newswire-energy news-releases/isa-recognizes-2026-celebrating-excellence-awardees-302848385.html
tip_junk_pattern tip-electrek https://electrek.co/2026/08/12/ford-reveals-new-25000-crossover-suv-dealers/
tip_junk_pattern tip-pr-newswire-energy e-steel-and-vanadium-redevelopment-project-in-trinidad-and-tobago-302849863.html
tip_junk_pattern tip-electrek ectrek.co/2026/08/12/jaguar-unveils-controversial-ev-interior-first-time-images/
tip_junk_pattern tip-federal-register-doe federalregister.gov/documents/2026/08/12/2026-16417/combined-notice-of-filings-2
tip_junk_pattern tip-pr-newswire-energy o-advance-affordable-reliable-energy-through-virtual-power-plants-302849737.html
tip_junk_pattern tip-electrek //electrek.co/2026/08/12/byds-new-ev-sedan-size-of-tesla-model-3-half-the-price/
tip_junk_pattern tip-electrek tps://electrek.co/2026/08/12/us-ev-prices-are-going-back-up-as-discounts-shrink/
tip_junk_pattern tip-pr-newswire-energy -powerchina-headquarters-to-advance-long-term-energy-partnerships-302849747.html
tip_junk_pattern tip-pr-newswire-energy abs-firma-un-acuerdo-plurianual-con-trafigura-y-adquiere-kinertic-302849978.html
tip_junk_pattern tip-pr-newswire-energy ire.com/news-releases/borr-drilling-limited--q2-2026-presentation-302849742.html
tip_junk_pattern tip-pr-newswire-energy e-expert-travis-corson-examines-tree-diseases-and-early-detection-302849778.html
tip_junk_pattern tip-pr-newswire-energy irman-hyun-joon-cho-drives-record-success-in-us-power-grid-market-302849019.html
tip_junk_pattern tip-pr-newswire-energy gms-and-red-mudgallium-advances-multiple-commercial-opportunities-302849783.html
tip_junk_pattern tip-electrek https://electrek.co/2026/08/11/kia-ev3-prices-range-revealed-starting-30000/
tip_junk_pattern tip-pr-newswire-energy -silver-medal-ranking-among-top-15-of-companies-assessed-globally-302849307.html
tip_junk_pattern tip-electrek /2026/08/12/trump-is-right-ev-range-anxiety-is-a-disease-this-is-how-we-cure-it/
tip_junk_pattern tip-pr-newswire-energy n-to-connect-the-next-generation-to-careers-in-the-water-industry-302849971.html
tip_junk_pattern tip-electrek k.co/2026/08/12/the-strange-story-behind-colorados-no-catch-free-e-bike-company/
tip_junk_pattern tip-pr-newswire-energy ne-and-margarita-copper-gold-concessions-to-local-artisanal-miner-302849840.html
tip_junk_pattern tip-electrek https://electrek.co/2026/08/12/volkswagen-launches-id-3-neo-uk-390-miles-range/
tip_junk_pattern tip-electrek tps://electrek.co/2026/08/12/global-ev-sales-are-rising-except-in-north-america/
tip_junk_pattern tip-electrek 8/12/ev-sales-oil-costs-and-temperatures-are-spiking-so-uk-govt-pushes-more-gas/
tip_junk_pattern tip-electrek -xp-lite2-e-bike-508-bundle-anker-solix-3840wh-f3800-power-station-ecoflow-more/
tip_junk_pattern tip-pr-newswire-energy -capital-partners-completes-acquisition-of-new-mexico-gas-company-302849990.html
tip_junk_pattern tip-electrek /2026/08/12/this-1800-electric-motorcycle-hits-70-mph-and-could-change-the-game/
tip_junk_pattern tip-pr-newswire-energy -grand-coupe-joins-the-2028-amaris-gt-and-2029-kaveya-super-coupe-302849198.html
tip_junk_pattern tip-electrek https://electrek.co/2026/08/12/waymo-ojai-robotaxis-arizona-factory/
tip_junk_pattern tip-pr-newswire-energy s-and-the-company-supports-kuwaits-2035-production-growth-targets-302849780.html
tip_junk_pattern tip-federal-register-doe federalregister.gov/documents/2026/08/12/2026-16416/combined-notice-of-filings-1
tip_junk_pattern tip-pr-newswire-energy tems-expert-mike-bonner-on-common-signs-of-hydraulic-hose-failure-302849847.html
tip_junk_pattern tip-electrek ctrek.co/2026/08/12/evgo-gm-open-350-kw-flagship-charging-for-evs-with-trailers/
tip_junk_pattern tip-pr-newswire-energy equity-bill-francis-assumes-role-of-vice-president-of-development-302849087.html
tip_junk_pattern tip-pr-newswire-energy abilities-in-california-with-acquisition-of-pax-environmental-inc-302849682.html
tip_junk_pattern tip-pr-newswire-energy es-north-american-growth-with-key-milestones-for-the-aventa-meter-302849009.html
tip_junk_pattern tip-electrek https://electrek.co/2026/08/12/tesla-124-stall-v4-supercharger-san-francisco/
probe_artifact ercot-tac https://www.ercot.com/robots.txt
tip_junk_pattern tip-pr-newswire-energy es-34-million-credit-facility-for-flexible-packaging-manufacturer-302849820.html