Every cited factual claim resolves to a primary source — tap a mark to see the source ■ 3 briefs
RM21-17: Order 1920 compliance filings due Feb 12, 2027

Story queue 2026-08-05

MUST-COVER OVERFLOW

  • no_material_delta pjm-mic-day-ahead-scheduling-phase2 — Phase 2 proposal, work plan, and options matrix recur on an already-covered thread (prior_coverage true); no member states what changed since last coverage, so re-selection is invalid without a stated delta.
  • no_material_delta pjm-mic-fuel-cost-affiliated-suppliers — Proposal, options matrix, and work plan recur on an already-covered thread (prior_coverage true); no member states a material delta since prior coverage.
  • no_material_delta pjm-mic-offer-verification-exception-timeline — Five-document package (problem statement, redline, proposal, issue charge, executive summary) on an already-covered thread; none of the members states what changed since prior coverage.

SELECTED QUEUE

#1 pjm

PJM committee weighs storage market rules, plus outside battery-operations analysis

unverified skeleton PJM committee weighs storage market rules, plus outside battery-operations analysis — shapes how storage resources get paid

Densest package of the cycle on this beat: two linked options matrices plus an outside Brattle Group analysis on market-based battery operations for the storage resource model; new thread, no prior coverage to reconcile.

#2 pjm

PJM MIC opens new issue on hybrid resources market-model selection

unverified skeleton PJM MIC opens new issue on hybrid resources market-model selection — formally scopes the debate, setting up the redline proposal stage watchers have been expecting.

Problem statement plus issue charge formally scope a new MIC issue on hybrid-resources market-model selection, fulfilling the open watch thread's expected proposal/redline stage.

material delta Issue charge and companion problem statement formally open the hybrid resources market model selection issue at MIC.

#3 pjm

PJM staff compared options for dual-fuel schedule requirements

unverified skeleton PJM staff compared options for dual-fuel schedule requirements — first concrete option set for a rule generators would need to plan around.

First options/packages matrix on dual-fuel schedule requirements is the concrete next artifact the open watch thread had been waiting on.

material delta First options/packages matrix comparing dual-fuel schedule requirement approaches; fulfills open watch thread.

WATCH RAIL — outside the story budget

open amazon-cincinnati-datacenter-campus pjm PJM interconnection filing or Duke Energy Ohio/AEP Ohio large-load service agreement for the campus
open aps-chip-manufacturing-load-growth west Arizona Corporation Commission rate filing or APS large-load tariff/interconnection filing for the added load
open aws-pa-gas-plant-datacenter pjm PJM interconnection filing or generation development agreement for the AWS gas-plant data center site
open az-2035-grid-snapshot west Primary 2035 resource-adequacy/reliability Snapshot planning report or its filing source — Trade press signals the primary 2035 Snapshot report is out; primary text not yet in our archive.
open bhe-montana-edam west Primary CAISO/EDAM filing or BHE Montana announcement confirming the 2028 participation commitment
open doe-genesis-mission-grid-resilience federal DOE award/cooperative-agreement announcement or Federal Register notice for the Genesis Mission initiative
open doe-nietc federal Primary DOE notice or Federal Register text confirming NIETC corridor cancellations — DOE reported cancelling proposed NIETC transmission corridor designations.
open doe-planning-software-efficiency federal Primary Federal Register notice text and DOE conference comment docket
open dominion-north-anna-esp-renewal federal Federal Register notice text / NRC docket for the North Anna early site permit renewal application — Notice recurs in feed; primary text still unstaged.
open edgecore-louisa-county-va-phase2 pjm Dominion Energy Virginia interconnection filing or county land-use/permit approval for Louisa County campus phase 2
open energy-vault-texas-datacenter-ppa ercot ERCOT interconnection filing or PPA/agreement underlying the 1.25GW supply deal
open entergy-holtec-hdec-gulf-coast-smr southeast NRC early site permit application or joint-development-agreement filing for Gulf Coast SMR siting
open ercot-ctp-batch1-tac-update ercot ERCOT CTP Batch 1 competitive transmission project selection results or further status update
open ercot-imm-state-of-market-tac ercot IMM State of the Market presentation/report delivered at the TAC workshop by 2026-08-13
open ercot-prs-2026-08-12-meeting ercot Aging Revision Request Projects review at the PRS meeting by 2026-08-12
open ercot-prs-2026-09-16-meeting ercot PRS meeting agenda/materials or results by 2026-09-19
open ercot-prs-report-tac ercot Next PRS status report to TAC
open ercot-tac-2026-08-26-meeting ercot TAC meeting agenda/materials or results by 2026-08-29
open ercot-tac-cfsg-0722 ercot Next CFSG report to TAC
open ercot-tac-cfsg-report ercot Next CFSG report to TAC
open ercot-tac-llwg-report ercot Next LLWG report to TAC
open ercot-tac-prs-0722 ercot Next PRS status report to TAC
open ercot-tac-prs-report-0826 ercot Next PRS status report to TAC — Fulfills the open watch thread's expected PRS status report to TAC.
open ercot-tac-revision-request-summary ercot Next Revision Request Summary status update to TAC
open ercot-tac-revision-request-summary-0722 ercot Next Revision Request Summary status update to TAC
open ercot-tac-rms-0722 ercot Next RMS status report to TAC
open ercot-tac-rms-report-0826 ercot Next RMS status report to TAC — Same-titled RMS report re-staged two days after the 08-19 posting; content difference unconfirmed from metadata.
open ercot-tac-ros-0722 ercot Next ROS status report to TAC
open ercot-tac-ros-report ercot Next ROS status report to TAC
open ercot-tac-ros-report-0826 ercot Next ROS status report to TAC — Fulfills the open watch thread's expected ROS status report to TAC.
open ercot-tac-staff-reports ercot Next ERCOT staff report to TAC — Fulfills the open watch thread's expected ERCOT staff report to TAC.
open ercot-tac-stakeholder-engagement-update ercot September ERCOT Board discussion/decision on stakeholder engagement
open ercot-tac-wms-0722 ercot Next WMS status report to TAC
open ercot-tac-wms-report ercot Next WMS status report to TAC
open ercot-tac-wms-report-0826 ercot Next WMS status report to TAC — Fulfills the open watch thread's expected WMS status report to TAC.
open ercot-texas-data-center-pause ercot ERCOT/PUCT filing or order on large-load/data-center interconnection pause
open eversource-isone-transmission-roe isone FERC order or settlement filing underlying the disclosed transmission-ROE charge
open ferc-large-load-senate-hearing federal Hearing transcript/testimony record from Senate ENR Committee (GET-incentives remarks) — New facet (GET incentives) surfaced from the already-watched Senate ENR hearing.
open ferc-large-load-standards ferc FERC ruling or the ISOs'/RTOs' joint extension-of-time request on large-load interconnection standards — ISOs/RTOs jointly seek 3-month extension from FERC on large-load interconnection standards deadline.
satisfied ferc-rm21-17 ferc the status-report document once staged, or FERC's resulting order on the extension request
open ferc-rm22-14 ferc FERC NOPR resolution or final order in RM22-14
open flteco-tysp southeast Tampa Electric Company's 2025 Ten-Year Site Plan PDF once staged
open google-midamerican-salix-county-iowa miso MidAmerican Energy/MISO interconnection filing or Iowa Utilities Board large-load tariff filing
open heinrich-texas-permitting federal Bill text or official legislative proposal on the permitting bottleneck
open isone-capacity-auction-reforms-keyproject isone ISO-NE status update or filing on capacity auction market redesign
open isone-extreme-weather-keyproject isone ISO-NE extreme-weather operations status update or report
satisfied isone-large-loads-integration-aug2026 isone FERC ruling on the abeyance request or resumption of the ISO-NE/PTO proceeding
open isone-necec-contested-effects isone Primary source documenting NECEC's disputed market/curtailment effects (ISO-NE report or docket filing)
open isone-order1920-keyproject isone ISO-NE Order 1920 long-term transmission planning compliance filing or update
open isone-order2023-keyproject isone ISO-NE Order 2023 interconnection reform compliance status update
open isone-order2222-keyproject isone ISO-NE Order 2222 compliance status update or filing
open miso-rasc-ferc-status miso Next RASC FERC docket status update
open miso-rasc-lba-transmission-loss miso RASC subcommittee discussion or proposed methodology revision resolving the new issue
open miso-rasc-outage-policy-evaluation miso RASC subcommittee discussion or proposed outage-policy methodology revision
open miso-rasc-sc-status miso Next RASC Steering Committee status update
open nepool-asset-condition-reviewer isone NEPOOL committee vote record or filing establishing the Asset Condition Reviewer
open nepool-pc-committee-summaries isone Next NPC Committee Summaries compilation
open nepool-pc-composite isone Next NPC meeting composite packet (following month's Participants Committee session).
open nepool-pc-coo-report isone Next month's COO status report to the NPC Participants Committee.
open nepool-pc-csc-imports-exports isone Next CSC imports/exports informational update, if the item recurs.
open nepool-pc-lit-report isone Next NEPOOL PC litigation status report
open nepool-pc-minutes isone Minutes of the next NPC Participants Committee meeting, once approved/posted.
open nepool-pc-supplemental isone Next NPC meeting composite/supplemental packet.
open nepool-pc-system-market-ops isone Next NPC System and Market Ops Report to NEPOOL PC
open nepool-pc-system-market-ops-report isone Next NPC System and Market Ops Report
open nerc-nist-mapping-rsdp-comments federal NERC notice/comment docket text for the NIST mapping RSDP proceeding
open nextera-dominion-merger federal State PUC and FERC (FPA §203) merger-approval filings/orders for the NextEra-Dominion transaction
open nj-battery-vpp-program pjm NJ BPU order or filing establishing VPP program eligibility rules
open nrc-duane-arnold-restart-eafonsi federal NRC draft EA/FONSI document or subsequent final EA/FONSI or license decision for Duane Arnold restart
open nrc-reactor-licensing-modernization federal Primary Federal Register rule text confirming scope (proposed/final rule) — Notice recurs in feed; primary text still unstaged.
open nyiso-icapwg nyiso ICAPWG meeting materials/presentation deck for the 2026-09-22 session by 2026-09-22
OVERDUE nyiso-icapwg-aggregation-manual-jul2026 nyiso ICAPWG/MIWG/PRLWG/LFTF discussion or endorsement of the M-38 Aggregation manual revisions by 2026-07-22
open nyiso-icapwg-der-small-utility nyiso MIWG/PRLWG discussion of DER treatment for small utilities in ICAP by 2026-08-19 — Final version of the DER small-utility ICAP technical bulletin, same 8/19 meeting thread
open nyiso-icapwg-manual-revisions nyiso MIWG/PRLWG discussion or endorsement of Manual 4 ICAP WRCE revisions by 2026-08-19 — ICAP Manual Revisions announcement doc posted ahead of the 8/19 ICAPWG meeting
open nyiso-icapwg-ucap-calculations-draft nyiso ICAPWG endorsement or vote on the UCAP Calculations methodology draft
open pjm-capacity-resource-mix pjm Primary PJM capacity market data or filing underlying the resource-mix competition described
open pjm-capacity-testing-requirements pjm Presentation or proposal on capacity testing requirements
open pjm-computational-load-oc-2026-07 pjm Problem statement or manual revision proposal for computational/data-center load (Project 2026-02) — PJM stakeholder outreach on Project 2026-02 computational/data-center load surfaces at OC, ahead of the anticipated problem statement.
open pjm-computational-load-pc-2026-07 pjm Problem statement or manual revision proposal for computational/data-center load (Project 2026-02) — Status presentation on Project 2026-02 computational/data-center load, delivered to PC
open pjm-computational-load-project pjm Problem statement or manual revision proposal for computational load
open pjm-data-center-plan-states-cost pjm PJM's filing or stakeholder proposal detailing the data-center/large-load cost framework
open pjm-deactivation-study-process-reform pjm PJM committee vote record or manual revision filing for the deactivation study process change
open pjm-deliverability-study-enhancements pjm Proposal/redline for the cluster-based interim deliverability study methodology enhancements
open pjm-gdecs-deactivation-chart-aug26 pjm Next generation deactivation notification status update
open pjm-gdecs-governing-document-revisions pjm MC/MRC vote adopting GDECS governing document revisions
open pjm-gen-deactivation-update pjm Next generation deactivation notification status update / newly noticed retirement filings
open pjm-governance-stakeholder-reforms-notice pjm Federal Register notice text / comment docket for PJM governance and stakeholder reforms
open pjm-interconnection-cycle1-review pjm PJM interconnection queue status report or cluster study results for Cycle 1
open pjm-interregional-planning-update pjm Next interregional planning coordination update / joint study results
OVERDUE pjm-manual-14d-revision-71 pjm MRC en-bloc vote adopting Manual 14D Revision 71 (Consent Agenda C) by 2026-07-28 — Presentation deck for tracked Manual 14D Revision 71 staged (Consent Agenda C).
open pjm-manual-14h-eit-revision pjm PC endorsement/vote on Manual 14H EIT revision — Presentation for tracked Manual 14H EIT revision arrives, consent agenda
open pjm-manual-14h-ids-revision pjm PC endorsement/vote on Manual 14H IDS revision — Redline text of proposed Manual 14H IDS revisions
open pjm-manual-14h-ieee2800-revisions pjm MRC/PC endorsement or vote on Manual 14H IEEE 2800 revisions — Executive summary for IEEE 2800 revisions now on MRC agenda for endorsement.
open pjm-manual-21b-periodic-review pjm PC/MRC vote on Manual 21B periodic review revisions — Executive summary for Manual 21B periodic review arrives at MRC
open pjm-mc-board-election-fall2026 pjm Board election results / member vote outcome
open pjm-mc-consent-c-flexible-resource-loc pjm MC consent-agenda vote adopting the flexible-resource LOC eligibility tariff change by 2026-08-19
open pjm-mc-destf-report pjm Next DESTF report to MC by 2026-08-24
open pjm-mc-dr-performance-review pjm DR performance review findings or proposed rule changes to MC
open pjm-mc-governance-stakeholder-poll pjm MC discussion/decision on stakeholder-process governance changes informed by the poll
open pjm-mc-ips-report-aug26 pjm IPS report document by 2026-08-24
open pjm-mc-market-monitoring-report pjm Next Market Monitoring Report to MC — Market Monitoring Report presentation staged for the 8/24 PJM MC meeting
open pjm-mc-market-ops-report pjm Next PJM Market Operations Report to MC
open pjm-mc-mic-report-aug26 pjm Next MIC report to MC by 2026-08-24
open pjm-mc-mrc-report-aug26 pjm Next MRC report to MC by 2026-08-24
open pjm-mc-oc-report-aug26 pjm Next OC report to MC by 2026-08-24
open pjm-mc-pc-report pjm Next PC report to MC
open pjm-mc-planning-parameter-deadlines pjm MRC/OC/PC vote or endorsement on the planning parameter deadlines problem statement — Problem statement now presented directly to MRC (previously MC issue-charge stage).
open pjm-mc-rcstf-report-aug26 pjm Next RCSTF report to MC by 2026-08-24
open pjm-mc-regulatory-report-aug26 pjm Next PJM regulatory report to MC by 2026-08-24
open pjm-mc-stakeholder-process-forum-aug26 pjm Forum recommendations / MC governance-reform discussion outcome by 2026-08-24
open pjm-mc-system-ops-report pjm Next system operations report to MC
open pjm-mc-system-ops-report-aug26 pjm Next system operations report to MC by 2026-08-24
open pjm-mc-tech-change-forum-report-aug26 pjm Tech Change Forum report document by 2026-08-24
open pjm-mc-voting-app-enhancements pjm MC discussion/decision on voting application enhancements by 2026-08-24
open pjm-mic-dual-fuel-schedule-requirements pjm MIC vote/decision on dual-fuel schedule requirements options
open pjm-mic-hybrid-resources-market-model pjm Proposal/redline for hybrid-resources market-model selection
open pjm-mic-interregional-coordination-aug26 pjm Next interregional planning coordination update / joint study results
open pjm-mic-manual-6-periodic-review pjm MIC/MRC endorsement or vote on Manual 6 periodic review revisions
open pjm-mic-net-energy-injections-q-review-aug26 pjm Next quarterly net energy injections review
open pjm-mic-stability-limit-report-jul26 pjm Next stability limit report
open pjm-mrc-bra-irm-results pjm Base Residual Auction filing/results using these reliability parameters
open pjm-mrc-capacity-parameters-periodic-review pjm MRC vote/endorsement on CONE and ACR value updates
open pjm-mrc-ceg-rmr-destf pjm MRC vote or endorsement on the CEG RMR / DESTF deactivation matters — DESTF presentation on related IL CUB deactivation matter added to MRC agenda.
OVERDUE pjm-mrc-manual-11-econregonlynem-consent pjm MRC en-bloc vote adopting Manual 11 econ/reg-only/NEM revisions (Consent Agenda B) by 2026-07-28
open pjm-mrc-manual-18-periodic-review pjm PC/MRC vote or endorsement on Manual 18 periodic review revisions
open pjm-mrc-manual-revisions-item01 pjm MRC vote or endorsement on item 01 manual revisions (Manual 11, Manual 28)
open pjm-mrc-storage-as-transmission-asset pjm Follow-up proposal or stakeholder vote on storage-as-transmission classification
open pjm-oc-day-ahead-survey pjm Next PJM day-ahead survey results
open pjm-oc-dlr-updates pjm Next DLR status update / deployment findings
open pjm-oc-dlr-updates-aug6 pjm Next DLR status update / deployment findings
open pjm-oc-fuel-inventory-survey pjm Next fuel inventory data request survey results
open pjm-oc-fuel-inventory-survey-summer2026 pjm Next fuel inventory data request survey results
open pjm-oc-hot-weather-update pjm Next hot weather operational status update
open pjm-oc-hot-weather-update-aug6 pjm Next hot weather operational status update
open pjm-oc-operating-metrics pjm Next OC operating metrics presentation
open pjm-oc-operating-metrics-aug6 pjm Next OC operating metrics presentation — Original version of the item 02 operating metrics deck, superseded by the 'updated presentation' also in this batch.
open pjm-oc-reliability-compliance-update pjm Next OC reliability compliance status update
open pjm-oc-reliability-compliance-update-aug6 pjm Next OC reliability compliance status update
open pjm-oc-security-update pjm Next OC security status update
open pjm-oc-security-update-aug6 pjm Next OC security status update
open pjm-oc-winter-prep-visit-update pjm Next winter generator site preparedness visit update
open pjm-pc-fuel-switching-issue pjm Proposal or solution package addressing the fuel-switching issue
open pjm-pc-ltplanning-nopr-feedback pjm PJM's compiled stakeholder feedback or comment filing on the long-term transmission planning NOPR
open pjm-pc-manual-21b-periodic-review pjm PC/MRC vote on Manual 21B periodic review revisions — Presentation now posted for Manual 21B periodic review.
open pjm-pc-reliability-compliance pjm Next reliability compliance status update/report to PC — Next recurring reliability compliance status report to PC.
open pjm-pc-reliability-compliance-aug4 pjm Next reliability compliance status update/report to PC
open pjm-regulation-redesign-phase2 pjm NPRR or market-rule filing/vote on Regulation Market Redesign Phase 2 — Status update on Regulation Market Redesign Phase 2 at OC, precursor to the anticipated NPRR/vote.
open pjm-teac-5034-immediate-need pjm TEAC solution selection/vote for Immediate Need Project 5034
open pjm-teac-gen-deactivation-aug4 pjm Next generation deactivation notification status update / newly noticed retirement filings by 2026-09-08
open pjm-teac-gen-deactivation-sep8 pjm Next generation deactivation notification status update / newly noticed retirement filings
open pjm-teac-interregional-planning-aug4 pjm Next interregional planning coordination update / joint study results by 2026-09-08
open pjm-teac-interregional-planning-sep8 pjm Next interregional planning coordination update / joint study results
open pjm-teac-m3-process-needs-aug4 pjm Next M-3 process needs status update by 2026-09-08
open pjm-teac-market-efficiency-aug4 pjm Next market efficiency project analysis update by 2026-09-08
open pjm-teac-market-efficiency-sep8 pjm Next market efficiency project analysis update
open pjm-teac-occ-comments-sep8 pjm TEAC discussion/resolution of outstanding OCC comments
open pjm-teac-planning-process-special-0716 pjm Any future Manual 3 revision or PC/MRC vote changing the transmission planning-process manual
open pjm-teac-reliability-analysis-aug4 pjm Next TEAC reliability analysis update / substantive findings report by 2026-09-08
open pjm-teac-reliability-analysis-update pjm Next TEAC reliability analysis update / substantive findings report
open pjm-teac-supplemental-projects-aug4 pjm Next TEAC supplemental project review update by 2026-09-08
open pjm-teac-supplemental-projects-sep8 pjm Next TEAC supplemental project review update
open pjm-vpp-federal-ruling pjm Primary order/ruling text on virtual power plant participation in PJM markets — Federal ruling reported on virtual power plant participation in PJM markets.
open ppl-blackstone-gas-turbines-pa pjm PJM interconnection filing, generation development agreement, or PPL/Blackstone JV announcement documenting the turbine order
open scpsc-docket-2026-186-eg southeast Hearing testimony record or PSC order in Docket 2026-186-EG
open southern-co-large-load-growth southeast Georgia PSC filing or Southern Co. IRP/tariff update detailing large-load service and cost terms — Q2 earnings call attributes growth to data centers; no Georgia PSC filing staged yet.
open spp-bod-addmat spp Minutes of the BOD meeting for 2008-07-29
open spp-bod-agenda spp Minutes of the BOD meeting for 2009-04-28 — Revised background materials supersede the initial packet for the same April 20, 2009 BOD meeting.
open spp-bod-annual-meeting spp Next Annual Meeting of Members materials/minutes
open spp-bod-bid-deposit-proposal spp BOD vote or decision on the SPC's Bid Deposit Proposal recommendation
open spp-bod-biweekly-status spp Next SPP BOD biweekly status report
open spp-bod-exec-session spp Next SPP BOD executive session record or resulting public action
open spp-bod-integrated-marketplace spp BOD discussion/decision or follow-up filing on the commitments mechanism
open spp-bod-market-status spp Next SPP Board market status report
OVERDUE spp-bod-mc-special-mtg spp Minutes/results of the special Board Meeting for 2024-06-12 by 2024-06-19
open spp-bod-mc-special-mtg-0903 spp Board/Members Committee resolution or vote result from the special session by 2026-09-03 — Called as a special joint Board/Members Committee session, unlike routine monthly meetings.
open spp-bod-mc-special-mtg-minutes spp Any resulting SPP filing or Board resolution from the 2024-05-07 special session — Minutes for the 2023-08-15 special meeting whose materials were also logged this batch.
open spp-bod-minutes spp Next SPP BOD meeting materials packet in this series — Minutes for the 2023-07-25 BOD/MC meeting whose materials packet was also logged this batch.
open spp-bod-minutes-19971112 spp Next SPP BOD meeting minutes/materials in this series
open spp-bod-minutes-19990928 spp Next SPP BOD meeting minutes/materials in this series
OVERDUE spp-bod-mopc-agenda spp BOD/MOPC meeting minutes/results for the 2013-07-01 session by 2013-07-01
open spp-bod-project-tracking-rpt-2008q4 spp Next quarterly SPP project tracking report
open spp-bod-rate-impacts-memo spp BOD discussion or decision referencing this rate-impacts analysis
open spp-bod-smom spp Any resulting SPP filing or Board resolution from the special members meeting
open spp-bod-stakeholder-survey spp Next stakeholder satisfaction survey results, if conducted again
OVERDUE spp-bod-suppmat spp BOD meeting minutes/results for the 2013-07-30 session by 2013-07-30
OVERDUE spp-bod-workshop spp BOD discussion or outcomes following the 2014-06-09/10 workshop by 2014-06-10
open spp-eis-market-completion-timeline spp Status update or completion filing for the EIS Market
open spp-eis-readiness-response spp Further EIS market readiness status update or completion filing
OVERDUE spp-mopc-agenda spp MOPC meeting minutes or resulting recommendation for 2020-10-13 by 2020-10-20
open spp-mopc-minutes spp Next SPP MOPC meeting materials packet in this series
open spp-mopc-nedtf-briefing spp Next MOPC follow-up update referencing this task force briefing
open spp-mopc-report-bod spp Next MOPC report to the SPP Board of Directors
open spp-mopc-rtwg-trr123 spp MOPC/RTWG vote or further status on TRR 123
open spp-oge-sponsored-upgrade spp SPP Board or stakeholder decision on the OGE-sponsored upgrade — New Q&A round on OGE's sponsored-upgrade request
open spp-order1920-engagement spp SPP's Order 1920 compliance filing or stakeholder engagement session results
open spp-rsc-action-items-status spp Next RSC Action Items Status Report
open spp-rsc-addmat spp Minutes of the RSC meeting for 2009-01-26
open spp-rsc-agenda spp Minutes of the RSC meeting for 2009-04-27 — Adds RR549 Winter Season RAR additional materials to the 2023-07-24 RSC packet.
open spp-rsc-bylaws-agenda spp RSC Bylaws Committee minutes or resulting bylaws amendment
open spp-rsc-cawg-summary spp RSC discussion/action stemming from the CAWG summary
open spp-rsc-long-term-planning-presentation spp RSC discussion or recommendation following the long-term planning presentation
open spp-rsc-ltcrtf-status spp Next LTCRTF status update to RSC
open spp-rsc-minutes spp Next SPP RSC meeting materials packet in this series — Minutes for the 2023-07-24 RSC meeting whose materials packet was also logged this batch.
OVERDUE spp-rsc-net-conference spp Minutes of the RSC net conference for 2019-08-05 by 2019-08-12
open spp-rsc-oms-seam-liaison-next-steps spp RSC vote/decision adopting the Seam Liaison Committee's next steps
open spp-rsc-operational-objectives spp Next RSC Operational Objectives report, if issued as a recurring series
open spp-rsc-retreat spp RSC retreat outcomes or follow-up materials
open spp-rsc-rr515-waiver spp RSC vote or resolution on the RR515 waiver process
open spp-rsc-seams-update spp RSC discussion or recommendation following the July 2017 Seams Update — Revised RSC seams update presented at the 2017-07-24 meeting, under the ongoing seams cost-allocation thread.
OVERDUE spp-rsc-special-mtg spp Minutes of the RSC special meeting for 2021-06-14 by 2021-06-21
open spp-rsc-special-mtg-minutes spp Any resulting SPP filing or Board resolution from the special session
OVERDUE spp-seams-brattle-presentation spp RSC discussion or recommendation on Brattle's seams cost allocation analysis by 2012-04-23
open spp-seams-report spp RSC discussion or recommendation following up on the Seams Report findings
OVERDUE spp-technical-conference spp Technical conference materials or outcome summary by 2007-01-28
open spp-west-baa-tariff-urgent-status spp SPP Board vote record or resulting West BAA tariff filing at FERC
open trump-v-slaughter-ferc ferc SCOTUS opinion/case record in Trump v. Slaughter plus any FERC statement on removal-power implications
open trump-wind-pause-court-ruling federal Court opinion/order text or DOD notice confirming the wind-review freeze is lifted — Trade press reports the DOD onshore-wind review freeze has lifted, corroborating the tracked thread
open tva-clinch-river-hearing federal NRC hearing outcome / construction-permit licensing decision — NRC has noticed a hearing for the Clinch River Unit 1 construction-permit review
open tva-clinch-river-unit1-licensing southeast NRC hearing outcome / construction-permit licensing decision for Clinch River Unit 1
open tva-nuclear-priority-interim-ceo southeast TVA investor materials, 10-Q, or IRP filing detailing nuclear investment priorities
open verrus-salem-oregon-datacenter west Oregon land-use/permit decision or utility interconnection filing for the Salem data center campus
open virginia-scc-datacenter-tx-cost-allocation pjm Virginia SCC order text / docket filing on transmission cost allocation for data centers
open wisconsin-atc-stargate-tx-line miso Wisconsin PSC order or ATC's refiled transmission-line application

CANDIDATES — KEPT & JUDGEABLE (60)

Dates on non-tip candidates are derived from URL paths (tips carry real published dates).

watch 7 pjm PJM Stakeholders Endorse Changes to Deactivation Study Processes tip-rto-insider 2026-08-05
RTO Insider tip: PJM stakeholders endorsed deactivation-study process changes; vote record not staged. · pjm-deactivation-study-process-reform · this_week · medium
cover_now 7 pjm item 04 2 hybrid resources market model selection issue charge pjm-mic · url-date 2026-08-05
MIC issue charge formally scopes hybrid resources market model selection process; fulfills open watch thread. · pjm-mic-hybrid-resources-market-model-20260805 · monitor · high
cover_now 7 pjm item 04 1 hybrid resources market model selection problem statement pjm-mic · url-date 2026-08-05
MIC problem statement opens hybrid resources market model selection issue; companion to issue charge item 04-2. · pjm-mic-hybrid-resources-market-model-20260805 · monitor · high
cover_now 7 pjm item 07 2 options packages matrix pjm energy storage resource model enhancements 852026 pjm-mic · url-date 2026-08-05
Options matrix comparing storage resource market-model enhancement paths. · pjm-mic-storage-resource-model-enhancements · monitor · medium
cover_now 7 pjm item 07 2 options packages matrix pjm energy storage resource model enhancements 852026 post meeting pjm-mic · url-date 2026-08-05
Post-meeting options matrix for storage resource-model enhancements. · pjm-mic-storage-resource-model-enhancements · monitor · medium
cover_now 7 pjm item 07 1 pjm energy storage resource model enhancements market based battery operations brattle group pjm-mic · url-date 2026-08-05
Brattle Group analysis on market-based battery operations for PJM storage model. · pjm-mic-storage-resource-model-enhancements · monitor · medium
cover_now 6 pjm item 06 3 resource scheduling prior to the day ahead energy market phase 2 work plan pjm-mic · url-date 2026-08-05
Work plan for Phase 2 of PJM's day-ahead resource-scheduling redesign. · pjm-mic-day-ahead-scheduling-phase2 · monitor · medium
cover_now 6 pjm item 01 3 fuel cost policy clarifications for affiliated fuel suppliers work plan pjm-mic · url-date 2026-08-05
Work plan accompanying PJM's affiliated-fuel-supplier cost-policy proposal. · pjm-mic-fuel-cost-affiliated-suppliers · monitor · high
cover_now 6 pjm item 05 options packages matrix dual fuel schedule requirements 852026 pjm-mic · url-date 2026-08-05
MIC options matrix compares dual-fuel schedule requirement packages ahead of committee decision. · pjm-mic-dual-fuel-schedule-requirements-20260805 · monitor · high
watch 6 pjm PJM’s big new data center plan: Make the states figure it out tip-canary-media 2026-08-05
Trade press on PJM's large-load/data-center cost-allocation approach; no primary filing staged. · pjm-data-center-plan-states-cost · monitor · medium
cover_now 6 pjm item 01 2 options packages matrix fuel cost policy clarifications for affiliated fuel suppliers 852026 pjm-mic · url-date 2026-08-05
Options matrix accompanying the affiliated-fuel-supplier cost-policy proposal. · pjm-mic-fuel-cost-affiliated-suppliers · monitor · high
cover_now 6 pjm item 06 1 resource scheduling prior to the day ahead energy market phase 2 proposal pjm-mic · url-date 2026-08-05
PJM's Phase 2 proposal for resource scheduling prior to the day-ahead market. · pjm-mic-day-ahead-scheduling-phase2 · monitor · medium
cover_now 6 pjm item 01 1 fuel cost policy clarifications for affiliated fuel suppliers pjm proposal pjm-mic · url-date 2026-08-05
PJM's own proposal on fuel-cost policy for affiliated suppliers — market-power angle. · pjm-mic-fuel-cost-affiliated-suppliers · monitor · high
cover_now 6 pjm item 06 2 options packages matrix resource scheduling prior to the day ahead energy market phase 2 852026 pjm-mic · url-date 2026-08-05
Options matrix for Phase 2 of day-ahead resource-scheduling redesign. · pjm-mic-day-ahead-scheduling-phase2 · monitor · medium
cover_now 5 pjm item 02 1 offer verification exception request timeline defintion problem statement pjm-mic · url-date 2026-08-05
Problem statement opening the offer-verification exception-timeline proposal. · pjm-mic-offer-verification-exception-timeline · monitor · medium
watch 5 federal Virginia Electric and Power Company, (Doing Business as Dominion Energy Virginia); North Anna Site; Early Site Permit Renewal Application tip-federal-register-nrc 2026-08-05
Federal Register notice of Dominion's North Anna early site permit renewal application; text not staged. · dominion-north-anna-esp-renewal · monitor · medium
cover_now 5 pjm item 02 3 offer verification exception request timeline defintion redline pjm-mic · url-date 2026-08-05
Redline text for the offer-verification exception-timeline rule change. · pjm-mic-offer-verification-exception-timeline · monitor · medium
cover_now 5 pjm item 02 5 offer verification exception request timeline defintion pjm proposal pjm-mic · url-date 2026-08-05
PJM's formal proposal for the offer-verification exception-timeline package. · pjm-mic-offer-verification-exception-timeline · monitor · medium
watch 5 pjm PJM Completes Application Review on Cycle 1 Projects tip-rto-insider 2026-08-05
Trade press on PJM completing interconnection Cycle 1 application review; no primary report staged. · pjm-interconnection-cycle1-review · monitor · medium
cover_now 5 pjm item 02 2 offer verification exception request timeline defintion issue charge pjm-mic · url-date 2026-08-05
Issue charge for the offer-verification exception-timeline package. · pjm-mic-offer-verification-exception-timeline · monitor · medium
cover_now 5 pjm item 02 4 offer verification exception request timeline defintion executive summary pjm-mic · url-date 2026-08-05
Exec summary of PJM's offer-verification exception-timeline proposal package to MIC. · pjm-mic-offer-verification-exception-timeline · monitor · medium
watch 4 pjm informational only interregional coordination update pjm-mic · url-date 2026-08-05
Recurring interregional planning-coordination status update to MIC. · pjm-mic-interregional-coordination-aug26 · monitor · medium
watch 4 isone Lit Report nepool-pc · url-date 2026-08-05
Standing NEPOOL PC litigation-status report; recurring series, specific content unconfirmed from terse title. · nepool-pc-lit-report-20260805 · monitor · low
watch 4 pjm informational only stability limit report july 2026 pjm-mic · url-date 2026-08-05
Recurring monthly stability limit report (July 2026). · pjm-mic-stability-limit-report-jul26 · monitor · medium
watch 4 pjm informational only pjm net energy injections quarterly review pjm-mic · url-date 2026-08-05
Recurring quarterly PJM net energy injections review. · pjm-mic-net-energy-injections-q-review-aug26 · monitor · medium
discard 4 State-by-State Shifts in Data Center Regulations and Their Impact on Electricity and Communities tip-t-d-world 2026-08-05
Multi-state data-center-regulation policy survey/commentary; no single primary document to cite. · single:8dd7deb7-6c73-57ec-9a23-3e0956d65fcc · monitor · medium
discard 4 LA City Council Votes to Allow Billion Dollar Scattergood Gas Plant Retrofit to Move Forward tip-cleantechnica 2026-08-05
Municipal (LADWP) city-council vote, not ISO/RTO/FERC market governance. · single:b8201cf2-43a8-5576-a8f0-ce9d60c6890c · monitor · medium
watch 3 pjm item 03 2 pjm manual 6 periodic review pjm-mic · url-date 2026-08-05
Routine PJM Manual 6 periodic review at MIC; new thread, watch for MRC/PC endorsement or vote. · pjm-mic-manual-6-periodic-review-20260805 · monitor · high
discard 3 pjm Blue Owl-backed Stack buys land in Culpeper County, Virginia tip-datacenterdynamics 2026-08-05
Data-center land purchase in Culpeper County VA; no MW figure or utility agreement, too early to track. · single:0759e809-8800-5357-9d59-53fca0f9cb28 · monitor · medium
discard 3 pjm item 03 1 pjm manual 6 conforming changes redline pjm-mic · url-date 2026-08-05
Conforming-changes redline to Manual 6; non-substantive alignment edit. · pjm-mic-manual-6-periodic-review · monitor · high
discard 3 AESO Rethinks Proposed Limits on Inflexible Energy Offers tip-rto-insider 2026-08-05
Real market-design story but AESO is Alberta (Canada) — out of Gridlight's U.S. charter scope. · single:a6f5a7d2-4abd-5612-bb4b-e0591be03206 · monitor · high
discard 3 Base Power raises $1B to get big batteries into more homes tip-canary-media 2026-08-05
Residential-battery startup funding round; not ISO/RTO or regulatory governance. · single:ce32e4b8-df45-5305-805e-6b4f72a9961a · monitor · high
discard 3 federal Uranium prices steady as EIA releases annual market report tip-ans-newswire 2026-08-05
Trade-press commodity-price commentary citing an EIA report; not a governance decision or filing. · single:d594f7dd-827a-519e-9363-eb507d8b739c · monitor · medium
discard 3 Entergy to consider deployment of Holtec's SMR-300 tip-world-nuclear-news 2026-08-05
Entergy 'considering' SMR-300 is an early corporate decision, not tied to any filing or docket. · single:e4463ade-9f0f-5edc-ab3f-07a7276df266 · monitor · medium
discard 2 Invinity sells 43MWh long-duration flow battery system to US Midwest rural electric cooperative tip-energy-storage-news 2026-08-05
Vendor battery sale to a co-op; commercial deal, not governance. · single:166d934d-fd9b-55cb-9e7c-8998a869b09b · monitor · high
discard 2 Hydrogen-iron flow batteries: How Elestor’s tech works tip-energy-storage-news 2026-08-05
Trade press tech explainer on flow batteries; not governance news · single:3008db10-61e8-5191-b279-f761d6a20734 · monitor · medium
discard 2 pjm Is PJM Too Big to Function tip-realclear-energy 2026-08-05
Op-ed aggregator opinion piece, no primary document or specific event to anchor a story. · single:468bb418-5c10-55f2-8d67-01525e293986 · monitor · medium
discard 2 Microsoft signs 23,602-ton carbon removal deal with wastewater alkalinity enhancement firm Crew tip-datacenterdynamics 2026-08-05
Corporate carbon-removal purchase agreement; not power-market governance. · single:58e18bb6-c108-5d96-b6e6-381525fd1e70 · monitor · high
discard 2 pjm agenda pjm-mic · url-date 2026-08-05
MIC meeting agenda (PDF); duplicate of the docx agenda, items scored separately. · pjm-mic-20260805-agenda · monitor · high
discard 2 Permitting Reform Should Be a Non-Partisan Issue tip-realclear-energy 2026-08-05
Op-ed on permitting reform, no bill/docket cited; op-ed aggregator noise. · single:6880793c-fc8a-5e1b-b79a-650548f1965c · monitor · high
discard 2 ercot Agenda PRS ercot-prs · url-date 2026-08-05
Agenda for the Aug 12 PRS meeting; substance already covered by the ballot and project-update items. · ercot-prs-2026-08-12-meeting · monitor · medium
discard 2 west PacifiCorp; Notice of Intent To Prepare an Environmental Assessment tip-federal-register-doe 2026-08-05
NOI to prepare EA, no project specifics in title; early-stage procedural. · single:8362d58d-a1d0-59e7-a4a3-7d20dcb33639 · monitor · low
discard 2 pjm agenda doc pjm-mic · url-date 2026-08-05
MIC meeting agenda document (docx); substantive items scored individually. · pjm-mic-20260805-agenda · monitor · high
discard 2 ercot August 12 2026 PRS Meeting Materials ercot-prs · url-date 2026-08-05
Bundled zip of Aug 12 PRS meeting materials; content already itemized separately (ballot, agenda, updates). · ercot-prs-2026-08-12-meeting · monitor · medium
discard 1 Las acciones tokenizadas aumentan un 140 % en 2026 mientras una nueva investigación de DeFiLlama analiza el mercado tip-globenewswire-energy 2026-08-05
Non-English stock-tokenization/crypto piece; unrelated to US power-market governance. · single:2c8b735c-2295-5576-807d-d1649c398dab · monitor · high
discard 1 New Denza Z9S Breaks Range & Handling Records At Average US Car Price tip-cleantechnica 2026-08-05
Consumer EV model review, unrelated to power market governance. · single:33b08935-54fc-57a0-9b32-e77cff5f2666 · monitor · high
discard 1 KKR’s ContourGlobal begins construction of ‘Sun at Night’ solar-plus-storage project in Chile tip-energy-storage-news 2026-08-05
Chilean solar-plus-storage construction start; out of beat (non-U.S. project news). · single:631ad3a0-db8e-552f-abb1-8ae14bcc407d · monitor · high
discard 1 Japan: Tokyo Gas enters offtake for 200MWh Fukushima BESS, Eku Energy nears completion of first project tip-energy-storage-news 2026-08-05
International storage offtake news, out of US power-market-governance beat. · single:778c6726-761e-5ec3-b51c-b9d78f48395c · monitor · high
discard 1 China Mobile considers sale of stake in Thailand's True Corporation - report tip-datacenterdynamics 2026-08-05
Telecom equity stake sale in Thailand, unrelated to power markets. · single:7d66e2cc-c0cf-52fc-89cb-06c99f57509c · monitor · high
discard 1 Sudan exempts solar systems from custom duties tip-pv-magazine 2026-08-05
Foreign customs policy, out-of-beat. · single:8c0a24e5-960f-5b2d-a701-8f39feb2023c · monitor · high
discard 1 The American EV Industry Is Dazed and Confused tip-heatmap-news 2026-08-05
EV industry feature; not power-market governance. · single:8efb789d-08c6-5ead-b3e5-e964096428d3 · monitor · high
discard 1 pjm informational only reminder to register for meetings in advance pjm-mic · url-date 2026-08-05
Administrative reminder to pre-register for meetings; no news content. · single:a1499d1f-6a10-550e-8773-8916dbf286e8 · monitor · high
discard 1 Climate Crusaders' Flimsy 'Extreme Event Attribution' tip-realclear-energy 2026-08-05
Op-ed on climate attribution methodology; opinion, not governance news. · single:b4271714-3c88-5e55-b888-a37e26cefb08 · monitor · high
discard 1 DeFiLlama 最新研究報告呈現市況,代幣化股票在 2026 年大幅上漲 140% tip-globenewswire-energy 2026-08-05
Off-topic press release (crypto/tokenized-stock research); irrelevant to power-market governance. · single:c7827e12-5f55-55dc-8212-6a07fcfd1197 · monitor · high
discard 1 שוק אסימוני המניות מזנק ב-140% ב-2026 בהתאם למיפוי השוק במחקר חדש של DeFiLlama tip-globenewswire-energy 2026-08-05
Hebrew-language DeFi/crypto PR spam misfiled under energy tip feed. · single:cc11070a-07a3-579a-8cbb-8ff2f6cfb280 · monitor · high
discard 1 We're Seeing a Class Divide in the Michigan Senate Results tip-realclear-energy 2026-08-05
Election-results op-ed, not electricity market governance. · single:cd51353f-99c0-5ad5-bda8-247e6b037203 · monitor · high
discard 1 AtlasEdge starts next expansion phase of data center in Hamburg, Germany tip-datacenterdynamics 2026-08-05
German data-center expansion; international, out of scope. · single:d781a76a-ee8e-5130-9855-49ea0af0a7e8 · monitor · high
discard 1 BYD BEV Sales Rise 31% in July! tip-cleantechnica 2026-08-05
EV sales figures, consumer/automotive noise. · single:dad64676-98c2-568b-97ef-54d1c361e317 · monitor · high
discard 1 An essential guide to wind turbine gear oil performance tests tip-power-technology 2026-08-05
Sponsored technical guide on turbine gear oil; ad content, not news · single:e2840d8c-a8c8-5dcf-a54b-a5e0fde05511 · monitor · high
discard 1 代币化股票 2026 年激增 140%,DeFiLlama 新研究绘制市场版图 tip-globenewswire-energy 2026-08-05
Non-English crypto/stock-tokenization piece; irrelevant, opaque title. · single:f090bf22-02ea-59f3-9f61-4c04d2575bb9 · monitor · high
PRE-FILTERED (34) — probe_artifact=1, tip_junk_pattern=33
tip_junk_pattern tip-pr-newswire-energy rgy-florida-customers-need-to-know-as-summer-heat-peaks-in-august-302843866.html
tip_junk_pattern tip-pr-newswire-energy releases/diego-mesa-puyo-selected-as-next-gef-ceo-and-chairperson-302843974.html
tip_junk_pattern tip-electrek .co/2026/08/05/nyc-council-preparing-nearly-20-new-e-bike-laws-and-restrictions/
tip_junk_pattern tip-electrek https://electrek.co/2026/08/05/byd-undercuts-luxury-rivals-first-7-seat-mpv-uk/
tip_junk_pattern tip-pr-newswire-energy d-the-mill-and-the-tailings-now-it-has-the-regulatory-pathway-too-302843843.html
tip_junk_pattern tip-pr-newswire-energy hina-edition-2025-fur-seine-fortschritte-im-bereich-esg-gewurdigt-302843920.html
tip_junk_pattern tip-pr-newswire-energy r-trade-for-domestic-quartz-industry-qmaa-industry-executives-say-302843845.html
probe_artifact pjm-mic es-groups/committees/mic/2026/20260805/20260805-draft-minutes---mic---782026.pdf
tip_junk_pattern tip-pr-newswire-energy ut-begins-for-new-power-line-to-reinforce-wisconsin-electric-grid-302844030.html
tip_junk_pattern tip-electrek https://electrek.co/2026/08/05/tesla-sues-manitoba-ev-rebate-ban/
tip_junk_pattern tip-pr-newswire-energy bode-extends-home-security-beyond-the-front-door-with-new-sensors-302843887.html
tip_junk_pattern tip-pr-newswire-energy -energy-systems-with-green-hydrogen-collaboration-in-south-africa-302843846.html
tip_junk_pattern tip-electrek //electrek.co/2026/08/05/tesla-megapack-power-orsted-big-new-texas-grid-battery/
tip_junk_pattern tip-federal-register-doe federalregister.gov/documents/2026/08/05/2026-15888/combined-notice-of-filings-2
tip_junk_pattern tip-pr-newswire-energy rengthens-global-enterprise-with-unified-corporate-brand-identity-302843338.html
tip_junk_pattern tip-electrek https://electrek.co/2026/08/05/kia-pv5-captures-37-europes-small-ev-van-market/
tip_junk_pattern tip-pr-newswire-energy seleccionado-como-proximo-director-ejecutivo-y-presidente-del-gef-302844022.html
tip_junk_pattern tip-pr-newswire-energy tweit-groWte-produktionsstatte-fur-high-end-pva-an-einem-standort-302843882.html
tip_junk_pattern tip-electrek //electrek.co/2026/08/05/segway-xafari-e-bike-xyber-e-bike-ecoflow-ecovacs-more/
tip_junk_pattern tip-pr-newswire-energy ment-of-fremont-gold-mine-property-secured-loan-ahead-of-schedule-302843977.html
tip_junk_pattern tip-electrek https://electrek.co/2026/08/05/fcc-bans-foreign-made-connected-solar-inverters/
tip_junk_pattern tip-electrek https://electrek.co/2026/08/05/evgo-branded-tesla-superchargers-are-coming/
tip_junk_pattern tip-pr-newswire-energy d-industry-leaders-expands-national-building-performance-practice-302844046.html
tip_junk_pattern tip-pr-newswire-energy releases/timken-declares-quarterly-dividend-of-36-cents-per-share-302843822.html
tip_junk_pattern tip-pr-newswire-energy ses/intco-medical-es-reconocida-por-sus-avances-en-materia-de-esg-302843922.html
tip_junk_pattern tip-electrek https://electrek.co/2026/08/05/2027-toyota-bz-woodland-prices-45000-awd/
tip_junk_pattern tip-pr-newswire-energy ens-corian-design-distribution-network-with-hallmark-and-parksite-302842933.html
tip_junk_pattern tip-federal-register-doe federalregister.gov/documents/2026/08/05/2026-15885/combined-notice-of-filings-1
tip_junk_pattern tip-pr-newswire-energy releases/diego-mesa-puyo-selected-as-next-gef-ceo-and-chairperson-302843999.html
tip_junk_pattern tip-pr-newswire-energy ws-releases/koppers-holdings-inc-declares-quarterly-cash-dividend-302843836.html
tip_junk_pattern tip-pr-newswire-energy -puyo-choisi-comme-prochain-directeur-general-et-president-du-gef-302844009.html
tip_junk_pattern tip-electrek https://electrek.co/2026/08/05/gm-buick-evs-china-overseas-suv/
tip_junk_pattern tip-pr-newswire-energy -data-technologies-named-nvidia-ai-factory-infrastructure-partner-302843854.html
tip_junk_pattern tip-electrek th-after-congress-killed-the-solar-tax-credit-the-industry-is-anything-but-dead/