Every cited factual claim resolves to a primary source — tap a mark to see the source ■ 3 briefs
RM21-17: Order 1920 compliance filings due Feb 12, 2027

Story queue 2026-07-28

MUST-COVER OVERFLOW

  • no_material_delta pjm-arrc-user-group-affordability — Sig-7 MC agenda item on ARRC user-group affordability (contested cost-allocation topic), but prior_coverage is true and no material_delta is stated for the single member. Per the re-selection rule, holding rather than drafting until what's new since prior coverage is confirmed.
  • topic_unconfirmed pjm-mc-technical-conference-report — Rationale itself flags the subject as 'unconfirmed from title alone,' and prior_coverage is true with no stated material_delta. Needs a document open before it can be queued responsibly — not selectable off a title.

SELECTED QUEUE

#1 pjm

PJM MRC takes up new pro forma reliability-must-run tariff for CEG units

unverified skeleton PJM MRC takes up new pro forma reliability-must-run tariff for CEG units — Part V and Attachment DD redlines set the terms keeping at-risk plants running.

Highest-significance episode today (8) and the largest cluster (8 members, saturated at 3): new pro forma RMR tariff redlines (OATT Part V, Attachment DD Schedule 53) plus the CEG-specific pro forma agreement and DESTF options matrix are all newly staged ahead of MRC review — core operative text for a live reliability-must-run proposal, not a recap.

material delta New pro forma RMR tariff redline text (Part V) and the OATT Attachment DD Schedule 53 redline are now staged for MRC review, alongside the CEG-specific pro forma RMR redline and DESTF's proposal presentation.

#2 pjm

PJM tariff redline for flexible-resource LOC eligibility hits MRC

unverified skeleton PJM tariff redline for flexible-resource LOC eligibility hits MRC — new text ahead of the MC consent vote

Sig-7 proposal moving toward an MC consent-agenda vote (~8/19): the tariff revisions redline and Manual 11/28 executive summary just arrived at MRC, giving new operative text ahead of that vote.

material delta Tariff revisions redline and Manual 11/28 revisions executive summary arrive at MRC for the flexible-resource LOC eligibility proposal, ahead of the MC consent vote.

#3 ercot

ERCOT files NPRR 1344 to move OBD provisions into Section 19 of the Market Test Plan

unverified skeleton ERCOT files NPRR 1344 to move OBD provisions into Section 19 of the Market Test Plan — a fresh protocol change worth tracking to resolution.

A newly filed ERCOT protocol-revision request (NPRR 1344) with its paired impact analysis — a fresh filing, not a status recap — and ERCOT is otherwise unrepresented in today's queue.

material delta New NPRR 1344 filing (moving the OBD provision to Market Test Plan Section 19) staged together with its impact analysis — initial docket entry for this revision request.

WATCH RAIL — outside the story budget

open amazon-cincinnati-datacenter-campus pjm PJM interconnection filing or Duke Energy Ohio/AEP Ohio large-load service agreement for the campus
open aps-chip-manufacturing-load-growth west Arizona Corporation Commission rate filing or APS large-load tariff/interconnection filing for the added load
open aws-pa-gas-plant-datacenter pjm PJM interconnection filing or generation development agreement for the AWS gas-plant data center site
open az-2035-grid-snapshot west Primary 2035 resource-adequacy/reliability Snapshot planning report or its filing source — Trade press signals the primary 2035 Snapshot report is out; primary text not yet in our archive.
open bhe-montana-edam west Primary CAISO/EDAM filing or BHE Montana announcement confirming the 2028 participation commitment
open doe-genesis-mission-grid-resilience federal DOE award/cooperative-agreement announcement or Federal Register notice for the Genesis Mission initiative
open doe-nietc federal Primary DOE notice or Federal Register text confirming NIETC corridor cancellations — DOE reported cancelling proposed NIETC transmission corridor designations.
open doe-planning-software-efficiency federal Primary Federal Register notice text and DOE conference comment docket
open dominion-north-anna-esp-renewal federal Federal Register notice text / NRC docket for the North Anna early site permit renewal application — Notice recurs in feed; primary text still unstaged.
open edgecore-louisa-county-va-phase2 pjm Dominion Energy Virginia interconnection filing or county land-use/permit approval for Louisa County campus phase 2
open energy-vault-texas-datacenter-ppa ercot ERCOT interconnection filing or PPA/agreement underlying the 1.25GW supply deal
open entergy-holtec-hdec-gulf-coast-smr southeast NRC early site permit application or joint-development-agreement filing for Gulf Coast SMR siting
open ercot-ctp-batch1-tac-update ercot ERCOT CTP Batch 1 competitive transmission project selection results or further status update
open ercot-imm-state-of-market-tac ercot IMM State of the Market presentation/report delivered at the TAC workshop by 2026-08-13
open ercot-prs-2026-08-12-meeting ercot Aging Revision Request Projects review at the PRS meeting by 2026-08-12
open ercot-prs-2026-09-16-meeting ercot PRS meeting agenda/materials or results by 2026-09-19
open ercot-prs-report-tac ercot Next PRS status report to TAC
open ercot-tac-2026-08-26-meeting ercot TAC meeting agenda/materials or results by 2026-08-29
open ercot-tac-cfsg-0722 ercot Next CFSG report to TAC
open ercot-tac-cfsg-report ercot Next CFSG report to TAC
open ercot-tac-llwg-report ercot Next LLWG report to TAC
open ercot-tac-prs-0722 ercot Next PRS status report to TAC
open ercot-tac-prs-report-0826 ercot Next PRS status report to TAC — Fulfills the open watch thread's expected PRS status report to TAC.
open ercot-tac-revision-request-summary ercot Next Revision Request Summary status update to TAC
open ercot-tac-revision-request-summary-0722 ercot Next Revision Request Summary status update to TAC
open ercot-tac-rms-0722 ercot Next RMS status report to TAC
open ercot-tac-rms-report-0826 ercot Next RMS status report to TAC — Same-titled RMS report re-staged two days after the 08-19 posting; content difference unconfirmed from metadata.
open ercot-tac-ros-0722 ercot Next ROS status report to TAC
open ercot-tac-ros-report ercot Next ROS status report to TAC
open ercot-tac-ros-report-0826 ercot Next ROS status report to TAC — Fulfills the open watch thread's expected ROS status report to TAC.
open ercot-tac-staff-reports ercot Next ERCOT staff report to TAC — Fulfills the open watch thread's expected ERCOT staff report to TAC.
open ercot-tac-stakeholder-engagement-update ercot September ERCOT Board discussion/decision on stakeholder engagement
open ercot-tac-wms-0722 ercot Next WMS status report to TAC
open ercot-tac-wms-report ercot Next WMS status report to TAC
open ercot-tac-wms-report-0826 ercot Next WMS status report to TAC — Fulfills the open watch thread's expected WMS status report to TAC.
open ercot-texas-data-center-pause ercot ERCOT/PUCT filing or order on large-load/data-center interconnection pause
open eversource-isone-transmission-roe isone FERC order or settlement filing underlying the disclosed transmission-ROE charge
open ferc-large-load-senate-hearing federal Hearing transcript/testimony record from Senate ENR Committee (GET-incentives remarks) — New facet (GET incentives) surfaced from the already-watched Senate ENR hearing.
open ferc-large-load-standards ferc FERC ruling or the ISOs'/RTOs' joint extension-of-time request on large-load interconnection standards — ISOs/RTOs jointly seek 3-month extension from FERC on large-load interconnection standards deadline.
satisfied ferc-rm21-17 ferc the status-report document once staged, or FERC's resulting order on the extension request
open ferc-rm22-14 ferc FERC NOPR resolution or final order in RM22-14
open flteco-tysp southeast Tampa Electric Company's 2025 Ten-Year Site Plan PDF once staged
open google-midamerican-salix-county-iowa miso MidAmerican Energy/MISO interconnection filing or Iowa Utilities Board large-load tariff filing
open heinrich-texas-permitting federal Bill text or official legislative proposal on the permitting bottleneck
open isone-capacity-auction-reforms-keyproject isone ISO-NE status update or filing on capacity auction market redesign
open isone-extreme-weather-keyproject isone ISO-NE extreme-weather operations status update or report
satisfied isone-large-loads-integration-aug2026 isone FERC ruling on the abeyance request or resumption of the ISO-NE/PTO proceeding
open isone-necec-contested-effects isone Primary source documenting NECEC's disputed market/curtailment effects (ISO-NE report or docket filing)
open isone-order1920-keyproject isone ISO-NE Order 1920 long-term transmission planning compliance filing or update
open isone-order2023-keyproject isone ISO-NE Order 2023 interconnection reform compliance status update
open isone-order2222-keyproject isone ISO-NE Order 2222 compliance status update or filing
open miso-rasc-ferc-status miso Next RASC FERC docket status update
open miso-rasc-lba-transmission-loss miso RASC subcommittee discussion or proposed methodology revision resolving the new issue
open miso-rasc-outage-policy-evaluation miso RASC subcommittee discussion or proposed outage-policy methodology revision
open miso-rasc-sc-status miso Next RASC Steering Committee status update
open nepool-asset-condition-reviewer isone NEPOOL committee vote record or filing establishing the Asset Condition Reviewer
open nepool-pc-committee-summaries isone Next NPC Committee Summaries compilation
open nepool-pc-composite isone Next NPC meeting composite packet (following month's Participants Committee session).
open nepool-pc-coo-report isone Next month's COO status report to the NPC Participants Committee.
open nepool-pc-csc-imports-exports isone Next CSC imports/exports informational update, if the item recurs.
open nepool-pc-lit-report isone Next NEPOOL PC litigation status report
open nepool-pc-minutes isone Minutes of the next NPC Participants Committee meeting, once approved/posted.
open nepool-pc-supplemental isone Next NPC meeting composite/supplemental packet.
open nepool-pc-system-market-ops isone Next NPC System and Market Ops Report to NEPOOL PC
open nepool-pc-system-market-ops-report isone Next NPC System and Market Ops Report
open nerc-nist-mapping-rsdp-comments federal NERC notice/comment docket text for the NIST mapping RSDP proceeding
open nextera-dominion-merger federal State PUC and FERC (FPA §203) merger-approval filings/orders for the NextEra-Dominion transaction
open nj-battery-vpp-program pjm NJ BPU order or filing establishing VPP program eligibility rules
open nrc-duane-arnold-restart-eafonsi federal NRC draft EA/FONSI document or subsequent final EA/FONSI or license decision for Duane Arnold restart
open nrc-reactor-licensing-modernization federal Primary Federal Register rule text confirming scope (proposed/final rule) — Notice recurs in feed; primary text still unstaged.
open nyiso-icapwg nyiso ICAPWG meeting materials/presentation deck for the 2026-09-22 session by 2026-09-22
OVERDUE nyiso-icapwg-aggregation-manual-jul2026 nyiso ICAPWG/MIWG/PRLWG/LFTF discussion or endorsement of the M-38 Aggregation manual revisions by 2026-07-22
open nyiso-icapwg-der-small-utility nyiso MIWG/PRLWG discussion of DER treatment for small utilities in ICAP by 2026-08-19 — Final version of the DER small-utility ICAP technical bulletin, same 8/19 meeting thread
open nyiso-icapwg-manual-revisions nyiso MIWG/PRLWG discussion or endorsement of Manual 4 ICAP WRCE revisions by 2026-08-19 — ICAP Manual Revisions announcement doc posted ahead of the 8/19 ICAPWG meeting
open nyiso-icapwg-ucap-calculations-draft nyiso ICAPWG endorsement or vote on the UCAP Calculations methodology draft
open pjm-capacity-resource-mix pjm Primary PJM capacity market data or filing underlying the resource-mix competition described
open pjm-capacity-testing-requirements pjm Presentation or proposal on capacity testing requirements
open pjm-computational-load-oc-2026-07 pjm Problem statement or manual revision proposal for computational/data-center load (Project 2026-02) — PJM stakeholder outreach on Project 2026-02 computational/data-center load surfaces at OC, ahead of the anticipated problem statement.
open pjm-computational-load-pc-2026-07 pjm Problem statement or manual revision proposal for computational/data-center load (Project 2026-02) — Status presentation on Project 2026-02 computational/data-center load, delivered to PC
open pjm-computational-load-project pjm Problem statement or manual revision proposal for computational load
open pjm-data-center-plan-states-cost pjm PJM's filing or stakeholder proposal detailing the data-center/large-load cost framework
open pjm-deactivation-study-process-reform pjm PJM committee vote record or manual revision filing for the deactivation study process change
open pjm-deliverability-study-enhancements pjm Proposal/redline for the cluster-based interim deliverability study methodology enhancements
open pjm-gdecs-deactivation-chart-aug26 pjm Next generation deactivation notification status update
open pjm-gdecs-governing-document-revisions pjm MC/MRC vote adopting GDECS governing document revisions
open pjm-gen-deactivation-update pjm Next generation deactivation notification status update / newly noticed retirement filings
open pjm-governance-stakeholder-reforms-notice pjm Federal Register notice text / comment docket for PJM governance and stakeholder reforms
open pjm-interconnection-cycle1-review pjm PJM interconnection queue status report or cluster study results for Cycle 1
open pjm-interregional-planning-update pjm Next interregional planning coordination update / joint study results
open pjm-manual-14d-revision-71 pjm MRC en-bloc vote adopting Manual 14D Revision 71 (Consent Agenda C) by 2026-07-28 — Presentation deck for tracked Manual 14D Revision 71 staged (Consent Agenda C).
open pjm-manual-14h-eit-revision pjm PC endorsement/vote on Manual 14H EIT revision — Presentation for tracked Manual 14H EIT revision arrives, consent agenda
open pjm-manual-14h-ids-revision pjm PC endorsement/vote on Manual 14H IDS revision — Redline text of proposed Manual 14H IDS revisions
open pjm-manual-14h-ieee2800-revisions pjm MRC/PC endorsement or vote on Manual 14H IEEE 2800 revisions — Executive summary for IEEE 2800 revisions now on MRC agenda for endorsement.
open pjm-manual-21b-periodic-review pjm PC/MRC vote on Manual 21B periodic review revisions — Executive summary for Manual 21B periodic review arrives at MRC
open pjm-mc-board-election-fall2026 pjm Board election results / member vote outcome
open pjm-mc-consent-c-flexible-resource-loc pjm MC consent-agenda vote adopting the flexible-resource LOC eligibility tariff change by 2026-08-19
open pjm-mc-destf-report pjm Next DESTF report to MC by 2026-08-24
open pjm-mc-dr-performance-review pjm DR performance review findings or proposed rule changes to MC
open pjm-mc-governance-stakeholder-poll pjm MC discussion/decision on stakeholder-process governance changes informed by the poll
open pjm-mc-ips-report-aug26 pjm IPS report document by 2026-08-24
open pjm-mc-market-monitoring-report pjm Next Market Monitoring Report to MC — Market Monitoring Report presentation staged for the 8/24 PJM MC meeting
open pjm-mc-market-ops-report pjm Next PJM Market Operations Report to MC
open pjm-mc-mic-report-aug26 pjm Next MIC report to MC by 2026-08-24
open pjm-mc-mrc-report-aug26 pjm Next MRC report to MC by 2026-08-24
open pjm-mc-oc-report-aug26 pjm Next OC report to MC by 2026-08-24
open pjm-mc-pc-report pjm Next PC report to MC
open pjm-mc-planning-parameter-deadlines pjm MRC/OC/PC vote or endorsement on the planning parameter deadlines problem statement — Problem statement now presented directly to MRC (previously MC issue-charge stage).
open pjm-mc-rcstf-report-aug26 pjm Next RCSTF report to MC by 2026-08-24
open pjm-mc-regulatory-report-aug26 pjm Next PJM regulatory report to MC by 2026-08-24
open pjm-mc-stakeholder-process-forum-aug26 pjm Forum recommendations / MC governance-reform discussion outcome by 2026-08-24
open pjm-mc-system-ops-report pjm Next system operations report to MC
open pjm-mc-system-ops-report-aug26 pjm Next system operations report to MC by 2026-08-24
open pjm-mc-tech-change-forum-report-aug26 pjm Tech Change Forum report document by 2026-08-24
open pjm-mc-voting-app-enhancements pjm MC discussion/decision on voting application enhancements by 2026-08-24
open pjm-mic-dual-fuel-schedule-requirements pjm MIC vote/decision on dual-fuel schedule requirements options
open pjm-mic-hybrid-resources-market-model pjm Proposal/redline for hybrid-resources market-model selection
open pjm-mic-interregional-coordination-aug26 pjm Next interregional planning coordination update / joint study results
open pjm-mic-manual-6-periodic-review pjm MIC/MRC endorsement or vote on Manual 6 periodic review revisions
open pjm-mic-net-energy-injections-q-review-aug26 pjm Next quarterly net energy injections review
open pjm-mic-stability-limit-report-jul26 pjm Next stability limit report
open pjm-mrc-bra-irm-results pjm Base Residual Auction filing/results using these reliability parameters
open pjm-mrc-capacity-parameters-periodic-review pjm MRC vote/endorsement on CONE and ACR value updates
open pjm-mrc-ceg-rmr-destf pjm MRC vote or endorsement on the CEG RMR / DESTF deactivation matters — DESTF presentation on related IL CUB deactivation matter added to MRC agenda.
open pjm-mrc-manual-11-econregonlynem-consent pjm MRC en-bloc vote adopting Manual 11 econ/reg-only/NEM revisions (Consent Agenda B) by 2026-07-28
open pjm-mrc-manual-18-periodic-review pjm PC/MRC vote or endorsement on Manual 18 periodic review revisions
open pjm-mrc-manual-revisions-item01 pjm MRC vote or endorsement on item 01 manual revisions (Manual 11, Manual 28)
open pjm-mrc-storage-as-transmission-asset pjm Follow-up proposal or stakeholder vote on storage-as-transmission classification
open pjm-oc-day-ahead-survey pjm Next PJM day-ahead survey results
open pjm-oc-dlr-updates pjm Next DLR status update / deployment findings
open pjm-oc-dlr-updates-aug6 pjm Next DLR status update / deployment findings
open pjm-oc-fuel-inventory-survey pjm Next fuel inventory data request survey results
open pjm-oc-fuel-inventory-survey-summer2026 pjm Next fuel inventory data request survey results
open pjm-oc-hot-weather-update pjm Next hot weather operational status update
open pjm-oc-hot-weather-update-aug6 pjm Next hot weather operational status update
open pjm-oc-operating-metrics pjm Next OC operating metrics presentation
open pjm-oc-operating-metrics-aug6 pjm Next OC operating metrics presentation — Original version of the item 02 operating metrics deck, superseded by the 'updated presentation' also in this batch.
open pjm-oc-reliability-compliance-update pjm Next OC reliability compliance status update
open pjm-oc-reliability-compliance-update-aug6 pjm Next OC reliability compliance status update
open pjm-oc-security-update pjm Next OC security status update
open pjm-oc-security-update-aug6 pjm Next OC security status update
open pjm-oc-winter-prep-visit-update pjm Next winter generator site preparedness visit update
open pjm-pc-fuel-switching-issue pjm Proposal or solution package addressing the fuel-switching issue
open pjm-pc-ltplanning-nopr-feedback pjm PJM's compiled stakeholder feedback or comment filing on the long-term transmission planning NOPR
open pjm-pc-manual-21b-periodic-review pjm PC/MRC vote on Manual 21B periodic review revisions — Presentation now posted for Manual 21B periodic review.
open pjm-pc-reliability-compliance pjm Next reliability compliance status update/report to PC — Next recurring reliability compliance status report to PC.
open pjm-pc-reliability-compliance-aug4 pjm Next reliability compliance status update/report to PC
open pjm-regulation-redesign-phase2 pjm NPRR or market-rule filing/vote on Regulation Market Redesign Phase 2 — Status update on Regulation Market Redesign Phase 2 at OC, precursor to the anticipated NPRR/vote.
open pjm-teac-5034-immediate-need pjm TEAC solution selection/vote for Immediate Need Project 5034
open pjm-teac-gen-deactivation-aug4 pjm Next generation deactivation notification status update / newly noticed retirement filings by 2026-09-08
open pjm-teac-gen-deactivation-sep8 pjm Next generation deactivation notification status update / newly noticed retirement filings
open pjm-teac-interregional-planning-aug4 pjm Next interregional planning coordination update / joint study results by 2026-09-08
open pjm-teac-interregional-planning-sep8 pjm Next interregional planning coordination update / joint study results
open pjm-teac-m3-process-needs-aug4 pjm Next M-3 process needs status update by 2026-09-08
open pjm-teac-market-efficiency-aug4 pjm Next market efficiency project analysis update by 2026-09-08
open pjm-teac-market-efficiency-sep8 pjm Next market efficiency project analysis update
open pjm-teac-occ-comments-sep8 pjm TEAC discussion/resolution of outstanding OCC comments
open pjm-teac-planning-process-special-0716 pjm Any future Manual 3 revision or PC/MRC vote changing the transmission planning-process manual
open pjm-teac-reliability-analysis-aug4 pjm Next TEAC reliability analysis update / substantive findings report by 2026-09-08
open pjm-teac-reliability-analysis-update pjm Next TEAC reliability analysis update / substantive findings report
open pjm-teac-supplemental-projects-aug4 pjm Next TEAC supplemental project review update by 2026-09-08
open pjm-teac-supplemental-projects-sep8 pjm Next TEAC supplemental project review update
open pjm-vpp-federal-ruling pjm Primary order/ruling text on virtual power plant participation in PJM markets — Federal ruling reported on virtual power plant participation in PJM markets.
open ppl-blackstone-gas-turbines-pa pjm PJM interconnection filing, generation development agreement, or PPL/Blackstone JV announcement documenting the turbine order
open scpsc-docket-2026-186-eg southeast Hearing testimony record or PSC order in Docket 2026-186-EG
open southern-co-large-load-growth southeast Georgia PSC filing or Southern Co. IRP/tariff update detailing large-load service and cost terms — Q2 earnings call attributes growth to data centers; no Georgia PSC filing staged yet.
open spp-bod-addmat spp Minutes of the BOD meeting for 2008-07-29
open spp-bod-agenda spp Minutes of the BOD meeting for 2009-04-28 — Revised background materials supersede the initial packet for the same April 20, 2009 BOD meeting.
open spp-bod-annual-meeting spp Next Annual Meeting of Members materials/minutes
open spp-bod-bid-deposit-proposal spp BOD vote or decision on the SPC's Bid Deposit Proposal recommendation
open spp-bod-biweekly-status spp Next SPP BOD biweekly status report
open spp-bod-exec-session spp Next SPP BOD executive session record or resulting public action
open spp-bod-integrated-marketplace spp BOD discussion/decision or follow-up filing on the commitments mechanism
open spp-bod-market-status spp Next SPP Board market status report
OVERDUE spp-bod-mc-special-mtg spp Minutes/results of the special Board Meeting for 2024-06-12 by 2024-06-19
open spp-bod-mc-special-mtg-0903 spp Board/Members Committee resolution or vote result from the special session by 2026-09-03 — Called as a special joint Board/Members Committee session, unlike routine monthly meetings.
open spp-bod-mc-special-mtg-minutes spp Any resulting SPP filing or Board resolution from the 2024-05-07 special session — Minutes for the 2023-08-15 special meeting whose materials were also logged this batch.
open spp-bod-minutes spp Next SPP BOD meeting materials packet in this series — Minutes for the 2023-07-25 BOD/MC meeting whose materials packet was also logged this batch.
open spp-bod-minutes-19971112 spp Next SPP BOD meeting minutes/materials in this series
open spp-bod-minutes-19990928 spp Next SPP BOD meeting minutes/materials in this series
OVERDUE spp-bod-mopc-agenda spp BOD/MOPC meeting minutes/results for the 2013-07-01 session by 2013-07-01
open spp-bod-project-tracking-rpt-2008q4 spp Next quarterly SPP project tracking report
open spp-bod-rate-impacts-memo spp BOD discussion or decision referencing this rate-impacts analysis
open spp-bod-smom spp Any resulting SPP filing or Board resolution from the special members meeting
open spp-bod-stakeholder-survey spp Next stakeholder satisfaction survey results, if conducted again
OVERDUE spp-bod-suppmat spp BOD meeting minutes/results for the 2013-07-30 session by 2013-07-30
OVERDUE spp-bod-workshop spp BOD discussion or outcomes following the 2014-06-09/10 workshop by 2014-06-10
open spp-eis-market-completion-timeline spp Status update or completion filing for the EIS Market
open spp-eis-readiness-response spp Further EIS market readiness status update or completion filing
OVERDUE spp-mopc-agenda spp MOPC meeting minutes or resulting recommendation for 2020-10-13 by 2020-10-20
open spp-mopc-minutes spp Next SPP MOPC meeting materials packet in this series
open spp-mopc-nedtf-briefing spp Next MOPC follow-up update referencing this task force briefing
open spp-mopc-report-bod spp Next MOPC report to the SPP Board of Directors
open spp-mopc-rtwg-trr123 spp MOPC/RTWG vote or further status on TRR 123
open spp-oge-sponsored-upgrade spp SPP Board or stakeholder decision on the OGE-sponsored upgrade — New Q&A round on OGE's sponsored-upgrade request
open spp-order1920-engagement spp SPP's Order 1920 compliance filing or stakeholder engagement session results
open spp-rsc-action-items-status spp Next RSC Action Items Status Report
open spp-rsc-addmat spp Minutes of the RSC meeting for 2009-01-26
open spp-rsc-agenda spp Minutes of the RSC meeting for 2009-04-27 — Adds RR549 Winter Season RAR additional materials to the 2023-07-24 RSC packet.
open spp-rsc-bylaws-agenda spp RSC Bylaws Committee minutes or resulting bylaws amendment
open spp-rsc-cawg-summary spp RSC discussion/action stemming from the CAWG summary
open spp-rsc-long-term-planning-presentation spp RSC discussion or recommendation following the long-term planning presentation
open spp-rsc-ltcrtf-status spp Next LTCRTF status update to RSC
open spp-rsc-minutes spp Next SPP RSC meeting materials packet in this series — Minutes for the 2023-07-24 RSC meeting whose materials packet was also logged this batch.
OVERDUE spp-rsc-net-conference spp Minutes of the RSC net conference for 2019-08-05 by 2019-08-12
open spp-rsc-oms-seam-liaison-next-steps spp RSC vote/decision adopting the Seam Liaison Committee's next steps
open spp-rsc-operational-objectives spp Next RSC Operational Objectives report, if issued as a recurring series
open spp-rsc-retreat spp RSC retreat outcomes or follow-up materials
open spp-rsc-rr515-waiver spp RSC vote or resolution on the RR515 waiver process
open spp-rsc-seams-update spp RSC discussion or recommendation following the July 2017 Seams Update — Revised RSC seams update presented at the 2017-07-24 meeting, under the ongoing seams cost-allocation thread.
OVERDUE spp-rsc-special-mtg spp Minutes of the RSC special meeting for 2021-06-14 by 2021-06-21
open spp-rsc-special-mtg-minutes spp Any resulting SPP filing or Board resolution from the special session
OVERDUE spp-seams-brattle-presentation spp RSC discussion or recommendation on Brattle's seams cost allocation analysis by 2012-04-23
open spp-seams-report spp RSC discussion or recommendation following up on the Seams Report findings
OVERDUE spp-technical-conference spp Technical conference materials or outcome summary by 2007-01-28
open spp-west-baa-tariff-urgent-status spp SPP Board vote record or resulting West BAA tariff filing at FERC
open trump-v-slaughter-ferc ferc SCOTUS opinion/case record in Trump v. Slaughter plus any FERC statement on removal-power implications
open trump-wind-pause-court-ruling federal Court opinion/order text or DOD notice confirming the wind-review freeze is lifted — Trade press reports the DOD onshore-wind review freeze has lifted, corroborating the tracked thread
open tva-clinch-river-hearing federal NRC hearing outcome / construction-permit licensing decision — NRC has noticed a hearing for the Clinch River Unit 1 construction-permit review
open tva-clinch-river-unit1-licensing southeast NRC hearing outcome / construction-permit licensing decision for Clinch River Unit 1
open tva-nuclear-priority-interim-ceo southeast TVA investor materials, 10-Q, or IRP filing detailing nuclear investment priorities
open verrus-salem-oregon-datacenter west Oregon land-use/permit decision or utility interconnection filing for the Salem data center campus
open virginia-scc-datacenter-tx-cost-allocation pjm Virginia SCC order text / docket filing on transmission cost allocation for data centers
open wisconsin-atc-stargate-tx-line miso Wisconsin PSC order or ATC's refiled transmission-line application

CANDIDATES — KEPT & JUDGEABLE (61)

Dates on non-tip candidates are derived from URL paths (tips carry real published dates).

cover_now 8 pjm item 02b 1 pro forma rmr agreement presentation pjm-mrc · url-date 2026-07-28
Presentation of the pro forma RMR agreement for CEG units — core document of the proposal. · pjm-mrc-ceg-rmr-destf · monitor · medium
cover_now 8 pjm item 02b 4 tariff part v revisions redline pjm-mrc · url-date 2026-07-28
Tariff Part V redline implementing the CEG RMR agreement — core proposal document. · pjm-mrc-ceg-rmr-destf · monitor · medium
cover_now 8 pjm item 02b 2 oatt att dd53 updated redline pjm-mrc · url-date 2026-07-28
OATT Attachment DD Schedule 53 redline, part of the same RMR tariff proposal package. · pjm-mrc-ceg-rmr-destf · monitor · medium
cover_now 8 pjm item 02c 2 ceg pro forma rmr redline pjm-mrc · url-date 2026-07-28
Proposed CEG pro forma RMR tariff redline — new reliability-must-run agreement for MRC review. · pjm-mrc-ceg-rmr-destf · monitor · medium
cover_now 8 pjm item 02b 3 pro forma rmr redline pjm-mrc · url-date 2026-07-28
New pro forma RMR tariff redline text — a new reliability-must-run agreement proposal for MRC. · pjm-mrc-ceg-rmr-destf · monitor · medium
cover_now 8 pjm item 02c 1 destf ceg proposal presentation pjm-mrc · url-date 2026-07-28
DESTF's CEG RMR proposal presentation — the substantive new reliability-must-run proposal. · pjm-mrc-ceg-rmr-destf · monitor · medium
cover_now 7 pjm item 01 2 proposed tariff revisions redline pjm-mrc · url-date 2026-07-28
Tariff revisions redline for flexible-resource LOC eligibility, MC vote expected ~8/19. · pjm-mc-consent-c-flexible-resource-loc · this_week · medium
cover_now 7 pjm item 02 arrc user group affordability consideration pjm-mc · url-date 2026-07-28
PJM MC agenda item: ARRC user group affordability presentation; contested cost-allocation topic. · pjm-arrc-user-group-affordability · this_week · medium
cover_now 7 pjm item 02d 2 destf options and packages matrix pjm-mrc · url-date 2026-07-28
DESTF options/packages matrix — supporting analysis for the CEG RMR proposal package. · pjm-mrc-ceg-rmr-destf · monitor · medium
watch 7 pjm item 06 2029 2030 bra fpr irm results presentation pjm-mrc · url-date 2026-07-28
2029/2030 reliability requirement (IRM) results presented — sets upcoming auction parameters. · pjm-mrc-bra-irm-results-2029-2030 · monitor · medium
watch 7 pjm item 05a 2 manual 14h requirements for inverter based resources executive summary pjm-mrc · url-date 2026-07-28
Exec summary for Manual 14H IEEE 2800 inverter-resource standards redline, itemized MRC agenda item. · pjm-manual-14h-ieee2800-revisions · monitor · medium
watch 7 pjm item 02d 1 destf il cub presentation pjm-mrc · url-date 2026-07-28
DESTF presentation on IL CUB deactivation matter tied to the CEG RMR proposal thread. · pjm-mrc-ceg-rmr-destf · monitor · medium
cover_now 7 pjm item 01 1 flexible resource loc eligibility presentation pjm-mrc · url-date 2026-07-28
Flexible-resource LOC eligibility proposal presented to MRC ahead of MC consent vote ~8/19. · pjm-mc-consent-c-flexible-resource-loc · this_week · medium
cover_now 6 ercot 1344NPRR 01 Move OBD to Section 19 Texas Market Test Plan 072826 ercot-nprr-tracker · url-date 2026-07-28
New ERCOT NPRR 1344 filing; protocol-section move for Market Test Plan, paired impact analysis. · ercot-nprr-1344 · this_week · medium
cover_now 6 pjm item 02a destf phase ii scope status report presentation pjm-mrc · url-date 2026-07-28
DESTF phase II status report — context for the concurrent CEG RMR proposal package. · pjm-mrc-ceg-rmr-destf · monitor · medium
watch 6 pjm item 03a 2 periodic review bonus deprection factor tariff change redline pjm-mrc · url-date 2026-07-28
Proposed tariff redline changing the bonus depreciation factor used in cost recovery. · pjm-mrc-capacity-parameters-periodic-review · monitor · medium
cover_now 6 ercot 1344NPRR 02 Impact Analysis 072826 ercot-nprr-tracker · url-date 2026-07-28
Impact analysis paired with new NPRR 1344 filing; same episode. · ercot-nprr-1344 · this_week · medium
cover_now 6 pjm item 04 technical conference report pjm-mc · url-date 2026-07-28
Technical conference report to MC; likely substantive readout, topic unconfirmed from title alone. · pjm-mc-technical-conference-report · this_week · low
watch 6 pjm item 03b pjm draft avoidable costs presentation pjm-mrc · url-date 2026-07-28
PJM's draft avoidable-costs presentation — feeds capacity-market mitigation offer floors. · pjm-mrc-capacity-parameters-periodic-review · monitor · medium
watch 6 pjm item 07 storage as a transmission asset informational report presentation pjm-mrc · url-date 2026-07-28
Informational report on storage-as-transmission-asset classification, a contested topic. · pjm-mrc-storage-as-transmission-asset · monitor · medium
watch 6 pjm item 04 2 planning parameter deadlines problem statement pjm-mrc · url-date 2026-07-28
Problem statement kicking off planning-parameter-deadlines stakeholder process at MRC. · pjm-mc-planning-parameter-deadlines · monitor · medium
cover_now 6 pjm item 01 3 manual 11 and 28 revisions executive summary pjm-mrc · url-date 2026-07-28
Manual 11/28 revisions supporting the flexible-resource LOC eligibility proposal. · pjm-mc-consent-c-flexible-resource-loc · this_week · medium
watch 6 pjm item 03a 1 periodic review of default cone and acr values presentation pjm-mrc · url-date 2026-07-28
Periodic review of Net CONE/ACR values that set capacity-market mitigation floors. · pjm-mrc-capacity-parameters-periodic-review · monitor · medium
watch 5 pjm item 01 elections presentation pjm-mc · url-date 2026-07-28
Board election presentation; process material ahead of the fall vote result. · pjm-mc-board-election-fall2026 · monitor · medium
watch 5 pjm item 05b 2 manual 18 revisions executive summary pjm-mrc · url-date 2026-07-28
Executive summary accompanying Manual 18 revisions redline at MRC. · pjm-mrc-manual-18-periodic-review · monitor · medium
watch 5 pjm item 01 4 manual 11 revisions redline pjm-mrc · url-date 2026-07-28
Manual 11 revisions redline, itemized (non-consent) MRC agenda item 01. · pjm-mrc-manual-revisions-item01 · monitor · medium
watch 5 pjm item 05b 3 manual 18 revisions redline pjm-mrc · url-date 2026-07-28
Manual 18 revisions redline, itemized (non-consent) MRC agenda item. · pjm-mrc-manual-18-periodic-review · monitor · medium
watch 5 pjm item 05a 3 manual 14h ieee 2800 revisions redline pjm-mrc · url-date 2026-07-28
Manual 14H redline updating IEEE 2800 inverter-based-resource interconnection standards. · pjm-manual-14h-ieee2800-revisions · monitor · medium
watch 5 pjm item 05a 1 manual 14h ieee 2800 revisions presentation pjm-mrc · url-date 2026-07-28
Presentation on Manual 14H IEEE 2800 inverter-resource standard revisions. · pjm-manual-14h-ieee2800-revisions · monitor · medium
watch 5 ercot 9. LLWG Report ercot-tac · url-date 2026-07-28
Large Load Working Group report to TAC; recurring subcommittee series, topically live (data centers). · ercot-tac-llwg-report · monitor · medium
watch 5 pjm item 05b 1 manual 18 periodic review revisions presentation pjm-mrc · url-date 2026-07-28
Presentation deck for Manual 18 periodic review revisions at MRC. · pjm-mrc-manual-18-periodic-review · monitor · medium
watch 5 pjm item 01 5 manual 28 revisions redline pjm-mrc · url-date 2026-07-28
Manual 28 revisions redline, itemized (non-consent) MRC agenda item 01. · pjm-mrc-manual-revisions-item01 · monitor · medium
watch 4 pjm consent agenda e 1 gdecs governing document revisions presentation pjm-mrc · url-date 2026-07-28
Proposed rule changes to the GDECS governing document, consent agenda. · pjm-gdecs-governing-document-revisions · monitor · medium
watch 4 pjm consent agenda e 3 iprtf gdecs iii april 2026 chart pjm-mrc · url-date 2026-07-28
IPRTF GDECS III deactivation-tracking chart, consent agenda. · pjm-gdecs-deactivation-chart-aug26 · monitor · high
watch 4 pjm consent agenda e 2 gdecs april 2026 chart pjm-mrc · url-date 2026-07-28
Routine GDECS deactivation-tracking chart, consent agenda. · pjm-gdecs-deactivation-chart-aug26 · monitor · high
watch 4 pjm item 04 3 planning parameter deadlines issue charge pjm-mrc · url-date 2026-07-28
Issue charge kicking off stakeholder process on planning parameter deadlines. · pjm-mc-planning-parameter-deadlines · monitor · medium
watch 4 pjm item 05c 3 manual 21b periodic review redline pjm-mrc · url-date 2026-07-28
Redline text for Manual 21B periodic review, tracked thread. · pjm-manual-21b-periodic-review · monitor · medium
watch 4 pjm item 05c 1 manual 21b periodic review presentation pjm-mrc · url-date 2026-07-28
Manual 21B periodic review presentation for tracked thread. · pjm-manual-21b-periodic-review · monitor · medium
watch 4 pjm item 04 1 planning parameter deadlines presentation pjm-mrc · url-date 2026-07-28
Presentation on planning parameter deadlines, tracked issue-charge thread. · pjm-mc-planning-parameter-deadlines · monitor · medium
watch 3 nyiso icapwg nyiso-icapwg · url-date 2026-07-28
NYISO ICAPWG meeting page for the 7/28 session; no materials posted yet. · nyiso-icapwg · monitor · low
watch 3 ercot 11. ERCOT Reports ercot-tac · url-date 2026-07-28
Recurring ERCOT staff report bundle to TAC; routine ops status series. · ercot-tac-staff-reports · monitor · high
watch 3 ercot 7. ROS Report ercot-tac · url-date 2026-07-28
Recurring ROS status report to TAC; routine reliability-subcommittee update. · ercot-tac-ros-report · monitor · high
watch 3 pjm consent agenda d 2 manual 14h eit revisions executive summary pjm-mrc · url-date 2026-07-28
Executive summary for Manual 14H EIT revisions, consent agenda. · pjm-manual-14h-eit-revision · monitor · medium
watch 3 pjm consent agenda d 1 manual 14h eit revisions presentation pjm-mrc · url-date 2026-07-28
Manual 14H EIT revisions presentation, consent agenda, tracked thread. · pjm-manual-14h-eit-revision · monitor · medium
watch 3 pjm consent agenda d 3 manual 14h eit revisions redline pjm-mrc · url-date 2026-07-28
Redline text for Manual 14H EIT revisions, consent agenda. · pjm-manual-14h-eit-revision · monitor · medium
watch 3 pjm consent agenda c 2 manual m14d revisions executive summary pjm-mrc · url-date 2026-07-28
Executive summary for tracked Manual 14D Revision 71, consent agenda. · pjm-manual-14d-revision-71 · monitor · medium
watch 3 ercot 10. CFSG Report ercot-tac · url-date 2026-07-28
Recurring CFSG subcommittee report to TAC; routine status update, newly tracked series. · ercot-tac-cfsg-report · monitor · medium
watch 3 pjm item 05c 2 manual 21b periodic review executive summary pjm-mrc · url-date 2026-07-28
Manual 21B periodic review exec summary for tracked thread; no vote yet. · pjm-manual-21b-periodic-review · monitor · medium
watch 2 pjm consent agenda b 2 manual 11 revisions executive summary pjm-mrc · url-date 2026-07-28
Executive summary for Manual 11 econ/reg-only/NEM revisions, consent agenda B. · pjm-mrc-manual-11-econregonlynem-consent · monitor · medium
watch 2 pjm consent agenda b 1 manual 11 econregonlynem revisions presentation pjm-mrc · url-date 2026-07-28
Presentation for Manual 11 econ/reg-only/NEM revisions, consent agenda B. · pjm-mrc-manual-11-econregonlynem-consent · monitor · medium
watch 2 pjm consent agenda c 1 manual m14d revisions presentation pjm-mrc · url-date 2026-07-28
Presentation for tracked Manual 14D Revision 71, consent agenda C. · pjm-manual-14d-revision-71 · monitor · medium
watch 2 pjm consent agenda c 3 manual 14d revisions redline pjm-mrc · url-date 2026-07-28
Redline for tracked Manual 14D Revision 71, consent agenda C. · pjm-manual-14d-revision-71 · monitor · medium
discard 2 pjm consent agenda b 3 manual 11 econregonlynem revisions redline pjm-mrc · url-date 2026-07-28
Manual 11 EconRegOnlyNem conforming redline, consent agenda, untracked and routine. · single:05a89619-01ea-53a4-8a2a-891456b0a4b4 · monitor · medium
discard 2 pjm agenda pjm-mrc · url-date 2026-07-28
Meeting agenda document, not a story itself. · single:201dff84-960a-5d94-8f78-c713a06b1766 · monitor · high
discard 2 pjm agenda pjm-mc · url-date 2026-07-28
Meeting agenda document; not a story itself. · single:3d67c205-0dcb-5130-8944-098b66d82c1a · monitor · high
discard 2 pjm agenda doc pjm-mc · url-date 2026-07-28
Duplicate agenda document (docx form); not a story itself. · single:3d9b854c-2463-52b6-a5dd-c31e3d5f3554 · monitor · high
discard 2 pjm agenda doc pjm-mrc · url-date 2026-07-28
Bare agenda cover document, no substantive content. · single:40c7538e-e71c-5944-8750-9bd6c5b4c178 · monitor · high
discard 1 pjm consent agenda a draft mrc minutes 6242026 pjm-mrc · url-date 2026-07-28
Draft MRC minutes on consent agenda — procedural record, not a story. · single:57a269a1-ddd1-50dc-b61b-ec5e45287d59 · monitor · high
discard 1 pjm consent agenda b draft special mc minutes 63026 pjm-mc · url-date 2026-07-28
Draft special MC minutes on consent agenda; routine housekeeping. · single:5c130a85-bf40-50a6-8a82-9890818d4d3a · monitor · high
discard 1 pjm consent agenda a draft mc minutes 62426 pjm-mc · url-date 2026-07-28
Draft MC minutes on consent agenda; routine housekeeping. · single:70f99251-a3da-537f-8efe-bf893d387a1c · monitor · high
discard 1 pjm administration a mc new member announcement pjm-mc · url-date 2026-07-28
Administrative new-member announcement; pure housekeeping. · single:d2ead59e-c0c3-5788-9c10-5a62396625ef · monitor · high
PRE-FILTERED (41) — tip_junk_pattern=41
tip_junk_pattern tip-federal-register-doe federalregister.gov/documents/2026/07/28/2026-15203/combined-notice-of-filings-1
tip_junk_pattern tip-electrek ttps://electrek.co/2026/07/28/baidu-apollo-go-london-robotaxi-testing-uber-lyft/
tip_junk_pattern tip-pr-newswire-energy p-to-97mw-of-additional-ai-capacity-from-on-site-power-generation-302836594.html
tip_junk_pattern tip-pr-newswire-energy drills-were-just-the-beginning-now-the-ground-is-moving-at-imwelo-302836457.html
tip_junk_pattern tip-pr-newswire-energy ts-sustainability-progress-across-global-operations-in-new-report-302836627.html
tip_junk_pattern tip-electrek 026/07/27/forget-what-you-read-on-facebook-94-of-ev-drivers-wont-go-back-to-gas/
tip_junk_pattern tip-electrek tps://electrek.co/2026/07/28/tesla-self-driving-manager-rolling-hazards-lawsuit/
tip_junk_pattern tip-pr-newswire-energy r-hero-encourages-homeowners-to-conserve-water-during-summer-heat-302836792.html
tip_junk_pattern tip-pr-newswire-energy unches-energy-hub-to-reduce-complexity-across-mixed-energy-fleets-302836595.html
tip_junk_pattern tip-federal-register-doe w.federalregister.gov/documents/2026/07/28/2026-15202/combined-notice-of-filings
tip_junk_pattern tip-pr-newswire-energy iec-62443-cybersecurity-standards-in-the-costa-rica-energy-sector-302836419.html
tip_junk_pattern tip-pr-newswire-energy oard-here-is-why-that-matters-for-a-multi-metal-cobalt-camp-story-302836314.html
tip_junk_pattern tip-pr-newswire-energy racon-announces-distribution-partnership-with-wt-microelectronics-302836791.html
tip_junk_pattern tip-electrek ctrek.co/2026/07/28/vermonts-largest-energy-source-is-now-a-virtual-power-plant/
tip_junk_pattern tip-pr-newswire-energy choosing-a-reliable-chemical-distribution-partner-for-hellonation-302836795.html
tip_junk_pattern tip-pr-newswire-energy akthrough-improves-emergency-response-and-reduces-toxic-emissions-302834355.html
tip_junk_pattern tip-electrek s://electrek.co/2026/07/28/mitsubishi-eclipse-sportback-ev-rebadged-nissan-leaf/
tip_junk_pattern tip-pr-newswire-energy vides-trading-update-for-q1-fy-2026-and-accelerates-share-buyback-302836732.html
tip_junk_pattern tip-pr-newswire-energy vides-trading-update-for-q1-fy-2026-and-accelerates-share-buyback-302836749.html
tip_junk_pattern tip-electrek /2026/07/28/youve-heard-of-shared-e-bikes-now-check-out-veos-new-shared-e-trike/
tip_junk_pattern tip-electrek //electrek.co/2026/07/28/byd-launches-worlds-first-sdv-kei-ev-starting-at-13000/
tip_junk_pattern tip-pr-newswire-energy ion-and-semiconductor-manufacturing-expansion-drive-global-growth-302836767.html
tip_junk_pattern tip-electrek ps://electrek.co/2026/07/28/volkswagen-launches-cheaper-id-polo-ev-orders-25000/
tip_junk_pattern tip-electrek 7/28/yamaha-is-preparing-to-launch-another-electric-scooter-design-filings-show/
tip_junk_pattern tip-electrek https://electrek.co/2026/07/28/mercedes-new-gla-ev-leaks-day-ahead-of-debut/
tip_junk_pattern tip-pr-newswire-energy -ev-charger-line-with-automotive-grade-engineering-and-validation-302836451.html
tip_junk_pattern tip-electrek 26/07/28/e-quipment-highlight-sany-skt145ei-cabless-autonomous-haul-truck-video/
tip_junk_pattern tip-electrek https://electrek.co/2026/07/28/tesla-buys-texas-solar-farm-output-zelestra/
tip_junk_pattern tip-electrek https://electrek.co/2026/07/28/tesla-arizona-solar-storage-ppa-project-sterling/
tip_junk_pattern tip-pr-newswire-energy eleases/next-bridge-hydrocarbons-releases-share-registration-data-302836751.html
tip_junk_pattern tip-electrek https://electrek.co/2026/07/28/kias-vehicles-smart-upgrade-2027/
tip_junk_pattern tip-electrek https://electrek.co/2026/07/28/tesla-sues-cybertruck-supplier-angstrom-tooling/
tip_junk_pattern tip-electrek https://electrek.co/2026/07/28/bmw-ramps-up-ix3-output-orders-near-100000/
tip_junk_pattern tip-electrek co/2026/07/28/greenworks-80v-crossovert-riding-mower-camplux-water-heaters-more/
tip_junk_pattern tip-electrek https://electrek.co/2026/07/27/bmw-i4-electric-convertible-2028/
tip_junk_pattern tip-pr-newswire-energy wswire.com/news-releases/mplx-lp-announces-quarterly-distribution-302836826.html
tip_junk_pattern tip-pr-newswire-energy xt-generation-leaders-named-2026-women-breaking-the-mold-honorees-302836655.html
tip_junk_pattern tip-pr-newswire-energy rer-la-transition-vers-le-systeme-energetique-de-demain-en-france-302836755.html
tip_junk_pattern tip-pr-newswire-energy ith-manifest-industries-and-adds-general-charles-flynn-as-advisor-302836731.html
tip_junk_pattern tip-electrek https://electrek.co/2026/07/28/saudi-prince-alwaleed-5-percent-lucid-stake-lcid/
tip_junk_pattern tip-pr-newswire-energy com/news-releases/hig-capital-schlieWt-die-ubernahme-von-avove-ab-302836803.html